Loading...
HomeMy WebLinkAboutPre-Bid AgendaCITY OF CAPE CANAVERAL Wastewater Treatment Plant Improvements for Oxidation Ditch Rehabilitation Project June 09, 2016 at 2:00 P.M. Attendees 1. Owner: City of Cape Canaveral Capital Projects Director: Jeff Ratliff Wastewater System Superintendent: June Clark 2, Engineer: Tetra Tech Phone: (407) 839-3955 Project Manager: Rasesh Shah (rasesh.shah(a tetratech.com) Number: 407-480-3926 (D), (407) 619-5175 (M) Fax: (407) 839-3790 II. Meeting Agenda 1. Introductions 2. Notice to Bidders • Bids are due 2:00 pm on Thursday, June 30, 2016 at City Hall (105 Polk Avenue, Cape Canaveral, FL 32920) • Questions received less than seven (7) calendar days (6/23 is the last day) prior to the date for opening of Bids will not be answered. 3. Proiect Requirements • Project Overview: i. Rehab. Existing Oxidation after taking it offline ii. Ready EQ Basin for aeration treatment— Add a baffle wall & membrane disc diffusers, blowers, and rent IR pumps. iii. Take ditch offline. iv. Perform Ditch Rehab - Drain & clean the ditch, install temp. Micro C system, repair the ditch as needed, install FRP panels, replace the 2 aerators, new stairs, paint bridge, and install new weir & gate. • This project needs to comply with "Davis -Bacon and American Iron and Steel Requirements". • Sequence of Construction: i. Install bypass pumping — from 1st Anoxic to the Ditch ii. Install yard piping, test, and put yard piping & ditch back in service. iii. Then perform EQ basin improvements iv. Get EQ in service after FDEP clearance and then take ditch offline. v. Drain, clean, remove water & grit. vi. Perform rehab. and necessary repairs • The City intends to direct purchase (ODP) all items that include $5,000 or more from a single supplier. More information is available under Instruction to Bidders Item17 - Taxes. • Certified weekly payrolls will be required for review by City. • $60,000 Ditch Structural Repair Allowance - Engineer will inspect and recommend improvements. The contractor will submit proposal for consideration. Owner will retain unused amount. • The WRF must remain in service and in FDEP compliance at all times during construction. Contractor shall provide bypass pumping as required. 4. Questions Page 2