HomeMy WebLinkAboutAgenda 11-19-2014 CITY OF CAPE CANAVERAL
54 py CE
r
t
T
_ �M
CITY OF
CAPE CANAVERAL
PRELIMINARY AND FINAL PLAT
APPLICATION PACKET
Instruction Sheet. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...2 & 3
Information Sheet. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4
Application Fee Sheet/Payment Receipt..............5
Escrow Deposit/Payment Receipt........................6
Flowchart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . .7
CDD- Prelim. & Final Plat App. 01/2011 Page 1
City of Cape Canaveral
PRELIMINARY AND FINAL PLAT
Instruction Sheet
A pre-application meeting with the City Planner is required prior to completion
and submittal of Plat applications.
See attached flowchart for preliminary and final plat review process.
The preliminary and final plats shall be prepared in compliance with the requirements of
Chapter 98 of our code. To access our code, visit cit ctcapec, e On the
home page, highlight City Departments, highlight City Clerk, then click on Code of
Ordinances; click on Municipal Code Corporation and this will take you to
municode.com, then click on Cape Canaveral Code of Ordinances.
If applicable, See Brevard County Geographic Research Division for street name and
address approval. This must be done prior to submittal of preliminary plat application.
The foll0vVing items must be In Vluded for there to be a complete and revlevvable
submittal. If all items are not included at time of submittal the application will not be
accepted for review.
Preliminary plat application submittal checklist
1. Completed Information Sheet.
2. Power of Attorney, if applicant is not the owner.
3. Payment of application fee and escrow deposit.
4. Copies of preliminary plat completed according to Sec. 98-41(b)(c). Initially
submit only 5 copies of the preliminary plat for staff review. After staff review
and comments have been addressed, additional copies of the revised
preliminary plat will be required before proceeding to Planning and Zoning
Board.
5. Current Opinion of Title.
CDD- Prelim. & Final Plat ADD. 01/2011 Page 2
Final plat application submittal checklist
1. Completed Information Sheet.
2. Power of Attorney, if applicant is not the owner.
3. Payment of filing fee and escrow deposit.
4. Copies of final plat. Initially submit only 5 copies of the final plat for staff
review. After staff review and comments have been addressed, additional
copies of the revised final plat will be required before proceeding to Planning
and Zoning Board.
5. Mylar or printable copy (upon staff approval)
6. Dedication Statements
7. Letter of credit, performance bond, or certified check.
8. Draft of protective covenants and if a homeowner's association, copies of the
ar L1111 3 %J incorporation, deciara tions and restrictions, and byia tiff s.
9. Current Opinion of Title
10. Mortgagee statements
CDD- Prelim. & Final Plat App.01/2011 Page 3
City of Gape Canaveral
PRELIMINARY AND FINAL PLAT
Information Sheet
Date of Submittal:
Project name:
Project address (if not available, provide general location)
Legal description:
FLU and Zoning designations:
(1\A/nnr(c\ name:
vVVI I Ikk A.
Owner(s) address:
Phone number(s):
Email(s):
If applicant is not owner, a completed Power of Attorney form is required.
Applicant name:
Applicant address:
App. phone number(s):
App. email(s):
Signature (owner or applicant):
CDD- Prelim. & Final Plat App. 01/2011 Page 4
City of Gape Canaveral
PRELIMINARY AND FINAL PLAT
Application Fee Sheet/Payment Receipt
Date:
Project Name:
Application Submittal Fee:
RESIDENTIAL Total # of Units:
1, 2 or 3 units = $37.50.................................................. $
4 units = $50.00........................................................... $
More than 4 units: add $7.50 per unit,( not to exceed $500)
# of units over 4 X $7.50........................ = $
Total Residential: = $
COMMERCIAL
$150 per acre or portion thereof.
acres X $150 per acre:.................................... = $
Total Application Fee: = $
CDD- Prelim. & Final Plat App.01/2011 Page 5
City of Cape Canaveral
y�
Escrow Deposit Request
Date:
Requested by:
Project Name:
Project Number:
Account Number: 001-000-000-202240
® Special Exception ® Preliminary Plat
® Site Plan ® Final Plat
® Variance ® Lot Split
® Rezoning ® Records Request
® Comp Plan Amendment ® Other
Preliminary & Final Plat Cost Estimate csreakdown
RESIDENTIAL: 2 to 4 Units......................$700.00
Over 4 Units to 50 Units..................$1,800.00
Over 50 Units or Hotel/Motel........$2,800.00
COMMERCIAL: Up to 4 Acres.................$1,800.00
Over 4 up to 8 Acres.....$2,300.00
Over 8 Acres- Review fee to be established after pre-
application meeting based on hourly rates estimated in Exhibit A of City
Engineer contract.
Total Acres:
Community Dev Dept. Services Provided:
Initial Deposit Required: Date Received:
Estimated Cost(s)
Vendor(s)
CDD- Prelim. & Final Plat App. 01/2011 Page 6
Preliminary & Final Plat Application Process
START
Pre-Application Meeting With Staff
Submit Application Packet
i
Complete
Application Is
Packet NO Application Packet
& Complete? --- - ---)
Resubmit Applicant
Addresses
F
Comments&
YES Resubmits
Distribute Application Packet to
City Reviewing
Staff for Review&-Comment
i
3tl bays I
I
--
Is Plat,Title, Reviewing Staff
NQ Comments.to
etc, Correct? Applicant
YES
Applicant Submits Additional Copies of Plat,etc.
Schedule&Advertise for next P&Z meeting
P& Z for Recommendation to City Council
Schedule&Advertise for City Council Meeting
City Council Approval
If Preliminary Plat, If Final Plat,
Recorded by City.:
Valid for 6 mos.
(extension available) -
FINISHED
Mschapman/flowchartslpreliminary&final plat/040510
CDD- Prelim. & Final Plat App. 01/2011 Page 7