Loading...
HomeMy WebLinkAboutAgenda Packet 03-21-2000CALL TO ORDER: PLEDGE OF ALLEGIANCE: ty of Cape Canaveral IL REGULAR MEETING 'HALL ANNEX D, Cape Canaveral, Florida TUESDAY arch 21, 2000 7:00 P.M. AGENDA ROLL CALL: PROCLAMATIONS: Fair Housing Month Earth Day, April 22 Child Abuse Prevention Month PRESENTATION: Economic Development Commission, Gregory Jones regarding the Community Data. Summary for the City of Cape Canaveral MIN_ Motion to Approve: City Council Regular Meeting Minutes of March 7, 2000. ORDINANCE — First Readinci: 1. Motion to Approve: Ordinance No. 05-2000, Amending the Definitions of Hotel and Motel AN ORDINANCE OF THE CITY OF CAPE CANAVERAL, BREVARD COUNTY, FLORIDA, AMENDING CODE SECTION 110-1, DEFINITIONS, BY AMENDING THE DEFINITIONS OF HOTEL AND MOTEL; PROVIDING FOR SEVERABILITY; PROVIDING FOR REPEAL OF CONFLICTING ORDINANCES; AND PROVIDING FOR AN EFFECTIVE DATE. CONSIDERATIONS: 2. Motion to Approve: Annual Audit for Year Ended September 30, 1999 105 Polk Avenue • Post Office Box 326 • Cape Canaveral, FL 32920-0326 Telephone (321) 868-1200 • FAX (321) 799-3170 . fcn.state.fl.us/cape/ e-mail: cape@iu.net Cape Canaveral City Council Regular Meeting Agenda March 21, 2000 Page 2 3. Motion to Approve: Interlocal Agreement with Brevard County —Traffic Signal Maintenance 4. Motion to Approve: Stormwater System Repairs 5. Motion to Approve: Washington Avenue Sidewalk Construction to Carl Hankins, Inc. in the amount of $16,402.50. 6. Motion to Approve: Contract Administration and Inspection Service for Reclaimed Water Phase III, #2 to Stottler, Stagg and Associates. 7. Motion to Approve: Cooperative Purchase of Sanitary Sewer Lining and Manhole Rehabilitation, in the amount of $139,012 to Griner's Pipeline Services. RESOLUTION: 8. Motion to Approve: Resolution No. 2000-07; Opposing Diversion of Transportation Revenue Proposed in HB893 and From Transportation Programs in General. DISCUSSION: 9. Reclaimed Water Project Update 10. Water Reclamation Sand Filters Report REPORTS: 11. City Manager's Report AUDIENCE TO BE HEARD: Comments will be heard on items that do not appear on the agenda of this meeting. Citizens will limit their comments to five (5) minutes. The City Council will not take any action under the "Audience To Be Heard" section of the agenda. The Council may schedule such items as regular agenda items and act upon them in the future. REPORTS CONTINUED: ADJOURNMENT: Pursuant to Section 286.1015, Florida Statutes, the City hereby advises the public that: If a person decides to appeal any decision made by the City Council with respect to any matter considered at this meeting, that person will need a recons of the proceedings, and for such purpose that person may need to ensure that a verbatim record of the proceedings is made, which recons includes the Cape Canaveral City Council Regular Meeting Agenda March 21, 2000 Page 3 testimony and evidence upon which the appeal is to be based. This notice does not constitute consent by the City for the introduction or admission into evidence of otherwise inadmissible or irrelevant evidence, nor does it authorize challenges or appeals not otherwise allowed by law. Persons with disabilities needing assistance to participate in any of these proceedings should contact the City Clerk's office (868-1221) 48 hours in advance of the meeting. CITY COUNCIL REGULAR MEETING CITY HALL ANNEX 111 Polk Avenue, Cape Canaveral, Florida TUESDAY March 7, 2000 7:00 P.M. MINUTES CALL TO ORDER: PLEDGE OF ALLEGIANCE: ROLL CALL: Council Members Present Larry Weber Richard Treverton Burt Bruns Mayor Pro Tem Buzz Petsos Mayor Rocky Randels Others Present City Manager, Bennett Boucher City Attorney, Kohn Bennett City Clerk, Sandra Smith Public Works Director, Edward Gardulski Building Official, Dennis Franklin PROCLAMATION: "KEEP BREVARD BEAUTIFUL MONTH" And April 15th, 2000 as "TRASH BASH DAY" Mayor Randels read the proclamation and Council Member Larry Weber presented the proclamation to Kacee Corbin and Paula Collins. MINUTES: A motion was made by Mr. Bruns and seconded by Mr. Petsos to approve the City Council Regular Meeting Minutes of February 15, 2000. The motion passed 5-0, with voting as follows: Mr. Weber, For; Mr. Treverton, For; Mr. Bruns, For; Mayor Pro Tem Petsos, For and Mayor Randels, For. Cape Canaveral City Council Regular Meeting Minutes March 7, 2000 Page 2 ORDINANCE ADOPTIONS - Second Reading: 1. Mayor Randels read Ordinance No. 03-2000 by title; Amending the Official Zoning Map by Rezoning Approximately 74.5 Acres from M-1 to C-2, for second reading. AN ORDINANCE OF THE CITY OF CAPE CANAVERAL, FLORIDA AMENDING THE OFFICIAL ZONING MAP AS DESCRIBED IN SECTION 110-246, CODE OF ORDINANCES BY CHANGING THE CLASSIFICATION OF TAX PARCELS 26, 500, 502, 750, 756, 757, 758, 760, 768, 782, 784, 785, 786, 787, 788, 796, 804, 806, 813, 815, 822, 824, 825, JIA, JIB, JIC, JID, JIE1, JIE2, JIE3, JII, JIJ, J111, JIG, JIK, JIL, AND JIM, CONTAINING APPROXIMATELY 74.5 ACRES, FROM THE CLASSIFICATION OF M-1 (LIGHT INDUSTRIAL) TO C-2 (COMM ERCIAUMANUFACTURING DISTRICT); AS DESCRIBED IN EXHIBIT A; PROVIDING FOR THE REPEAL OF PRIOR AND INCONSISTENT ORDINANCES AND RESOLUTIONS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. A motion was made by Mayor Pro Tem Petsos and seconded by Mr. Bruns to approve Ordinance 03-2000 for second reading. Mr. Petsos stated that this ordinance would help commercial businesses in the City. Don Haynes agreed with the C-2 ordinance concept, and queried how the status of his warehouse project would be impacted. City Attorney, Kohn Bennett, responded that since the site plan was previously approved and three of the four warehouses have been constructed, the warehouse yet to be built would be in conformity and not require a special exception. Mr. Art Berger, resident and business owner, queried why the interior setbacks were chosen for C-2, they coincide with M-1, not C-1. Mr. Bennett explained that Council determined that because the district was previously characterized, it is more consistent to use the M-1 district regulations. Mr. Berger related that Mayor Randels informed him that there is an option to opt out of the C-2 zoning change. Mr. Petsos retorted that no Council Member has the authority to suggest this type of direction. Todd Peetz, City Planner of Ivey, Harris and Williams, explained that the method of opting out would require applying for C-1 or M-1 zoning. Mr. Berger expressed concern that he owns two contiguous properties that are zoned differently. Mr. Bennett explained that contiguous properties of one owner would be considered under the same zoning regulations. Cape Canaveral City Council Regular Meeting Minutes March 7, 2000 Page 4 3. Public Works Director, Ed Gardulski, explained that the bids were advertised and there were no responses. He related that he received two quotes since, realizing that it is not within the purchasing regulations. He, therefore, requested that Council waive the bid process and accept one of the quotes. A motion was made by Mr. Petsos and seconded by Mr. Bruns to approve the Contract Award for Baffle Box Purchase and Installation, Santa Cruz Construction in the amount of $36,050 in conjunction with the proposal. Mr. Treverton queried if samples have been taken yet from the proposed outfall sites. He suggested that tests be conducted in-house now for comparison after the baffle boxes are installed. Council concurred. The motion passed 5-0, with voting as follows: Mr. Weber, For; Mr. Treverton, For; Mr. Bruns, For; Mayor Pro Tem Petsos, For and Mayor Randels, For. REPORTS: City Manager — Bennett Boucher o Mr. Boucher reported that the City would host the Space Coast League of Cities on April 10th at the Radisson. o Mr. Boucher reported that he spoke with FDOT and the County regarding the school crossing at the International Drive intersection on A1A. He related that the state was not responsive. He and Mr. Gardulski concur that the issue must be addressed politically. Mr. Petsos suggested that the City possibly notify the School Board that the City will pull the School Crossing Guards until the proper signage and a pedestrian signal, not a traffic light. He was adamant in illustrating the safety issues. Council concurred to notify the County tomorrow. Mr. Bruns requested that Major McGee be informed that officer presence at the school crossing is imperative. o Mr. Boucher requested to schedule a workshop session to consider the general fund five-year capital plan. Council concurred for Thursday, March 23`d at 5:00 p.m. in the library. The Enterprise Fund will also be reviewed to confirm that amendments were instituted appropriately. o The Building Department set its Contractors Forum for next Thursday, March 16th at 2p.m. Mr.. Petsos queried if 2pm is a good time for contractors to attend. Mr. Boucher related that if there is an evident problem, a night meeting could be scheduled. o Mr. Boucher related that Major George McGee will be promoted to Commander, he will either be transferred or the City can budget to retain him. Cape Canaveral City Council Regular Meeting Minutes March 7, 2000 Page 5 o Mr. Boucher commended the volunteers and Public Works staff for their efforts on the sand -fencing project. He queried if we should proceed with a sea oats project. o Mr. Boucher reported that the Business and Cultural Development Board has worked diligently to conduct an art display in the Veterans Memorial Park in conjunction with the Patriot's Day Parade. o Mr. Gardulski received approval for a $72,180 grant from SJRWMD for reclaimed water installation. Audience o No report. City Clerk — Sandra Smith v No report City Attorney - Kohn Bennett o Mr. Bennett queried if the Council Seminar could be conducted in conjunction with the March 23 workshop. Council concurred. City Council Member — Larry Weber • Mr. Weber reported on projects that will be conducted by "Keep Brevard Beautiful." City Council Member — Richard Treverton o No report. City Council Member — Burt Bruns ■ Mr. Bruns queried whom to contact when a problem is observed with a City sprinkler system after City work hours. Mr. Boucher related that he would distribute the emergency contact list; however, the City Manager should be contacted. Mayor Pro Tem — Buzz Petsos • Mr. Petsos stated that the plastic flamingoes should not be allowed on Tower Boulevard. Cape Canaveral City Council Regular Meeting Minutes March 7, 2000 Page 6 • Mr. Petsos queried if the Navy band can be in the front of the parade. • Mr. Petsos queried about the Computer master plan status. Mr. Boucher related that he is in the process of developing the plan. • Mr. Petsos related that the Sand Fencing volunteer project would be completed on Saturday, March 25tH • Mr. Petsos reported on the Beach Cleaning Demonstration, and related that he would like to pursue purchasing the cleaner cooperatively with the Canaveral Port Authority. He stated that it would be beneficial to the City. Council concurred that staff should negotiate with the Port to pursue the concept. • Mr. Petsos queried if the additional signs constructed at the Blue Cafe are in compliance. Also, he queried about the legitimacy of the Tomato Grill signs. Mayor — Rocky Randels • Mayor Randels reported that he has met with residents of Winslow Apartments at Avon -by -the -Sea. He related that apparently there is not enough money in the MSTU to cover Avon -by -the -Sea. He reported that the County is cooperating to rectify their issues. • Mayor Randels reported that he would be meeting with County Mayors tomorrow; do we have any issues? Yes, School Crossing on Al A. • Mayor Randels reported that the Space Coast Press is giving good coverage for the City, primarily thanks to Jackie Coates and Ann Samuels. • Mayor Randels reported that he persuaded FPL to cut a piece of a wooden light pole that was removed and attached to a concrete pole as a home for a woodpecker. • Mayor Randels reported that the Armed Forces Day Committee is seeking a committee member. There being no further business, the meeting adjourned at 8:26 pm. Rocky Randels, MAYOR Sandra Smith, CITY CLERK Meeting Type: Regular Meeting Meeting Date: 03-21-00 AGENDA Heading Ordinances - 151 Reading Zoning Board. Item 1 No. 25 % maximum allowed for kitchen facilities in hotel/motel units. See attached information. AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: ORDINANCE NO. 05-2000, AMENDING CODE SECTION 110-1, DEFINITIONS OF HOTEL/MOTEL DEPT./DIVISION: P&Z/GROWTH MANAGEMENT Requested Action: City Council consider amending the definitions for hotels and motels as recommended by the Planning & Zoning Board. Summary Explanation & Background: The Planning & Zoning Board recommended changing the definitions of hotel and motel by removing the 25 % maximum allowed for kitchen facilities in hotel/motel units. See attached information. Exhibits Attached: P&Z minutes; Ordinance No. 05-2000; Existing Code City M is Office , --� Department P&Z/GROWTH MGMT L _ council/mee 1-00/05-2000.doc City of Cape Canaveral Planning & Zoning Board March 8, 2000 7:30 P.M. Meeting Minutes A Regular meeting of the Planning & Zoning Board of the City of Cape Canaveral, Florida, was held on March 8, 2000 at the City Hall Annex, 111 Polk Avenue, Cape Canaveral, Florida. The meeting was called to order at 7:30 P.M. by Chairperson McNeely. The Secretary called the roll. MEMBERS PRESENT Beatrice McNeely Donald Bergen John Fredrickson Andrea Shea -King Leo Nicholas MEMBERS ABSENT Lamar Russell OTHERS PRESENT Bennett Boucher Dennis Franklin Todd Peetz Greg Mullins Karl Bohne Kohn Bennett Susan Chapman NEW BUSINESS Chairperson 1 st Alternate Vice Chairperson City Manager Building Official City Planner Code Enforcement Officer Temporary City Attorney City Attorney Secretary to the Board 1. Approval of Meeting Minutes: February 23, 2000. Motion by Mr. Fredrickson, seconded by Ms. Shea -King to approve the meeting minutes of February 23, 2000 as presented. Vote on the motion carried unanimously. PLANNING & ZONING BOARD MEETING MINUTES MARCH 8, 2000 PAGE 2 DISCUSSION: Discussion and Recommendation Re: Proposed Ordinances to Incorporate Timeshares in Chapter 110 of the Cape Canaveral Code of Ordinances. The Board members reviewed the re -drafted proposed ordinances. Discussion was held regarding the 25% maximum number of kitchens allowed in hotels. After an ensuing discussion, the Board members concluded that the best solution for the entire city would be to delete the full -kitchen facility limitation. Motion by Mr. Bergen, seconded by Mr. Fredrickson to recommend approval to the City Council to delete the 25% maximum number of full -kitchen facilities requirement in a hotel. Vote on the motion carried unanimously. 2. Discussion and Recommendation Re: Proposed Sign Ordinance. City Planner Todd Peetz advised that the City Council did not support a referendum. He explained that he went back through the document and made changes which included: returning the size and height of the signs back to the original size and height requirements; added a phrase about government flags not being a banner, corrected the matrix and illustrations consistent with the size and height of signs. He further changed the amortization date to 2005 because the proposed amendments to the sign code were minor. Discussion followed. Various changes were made to the proposed draft. It was agreed that staff would work together and present the additional changes at the next meeting. By Board consensus, the item would be placed on the next meeting agenda for further discussion and recommendation to City Council. 3. Discussion and Recommendation Re: Proposed Ordinance Changes to Chapter 82-371, Posting and Specification of Numbers for Structures or Buildings that are Setback Beyond 50 Feet from the Property Lines. Discussion was held regarding the inconsistency of placement of property addresses throughout the City. Mr. Peetz suggested that perhaps the City could offer a few options such as: posting the numbers on the curb, street signs, mailboxes, and ground signs. PLANNING & ZONING BOARD MEETING MINUTES MARCH 8, 2000 PAGE 3 Discussion was held regarding the appropriate size the number should be if posted on a building, where the building is beyond 50 -feet from a property line. Mr. Franklin advised that he would contact the fire and sheriffs dept. to get there input on the subject and would report back to the Board at the next meeting. By Board consensus, the item would be placed on the next meeting agenda for further discussion and recommendation to City Council. There being no further business, the meeting was adjourned at 9:05 P.M. Approved on this day of , 2000. Beatrice McNeely, Chairperson Susan L. Chapman, Secretary ORDINANCE NO. 05-2000 AN ORDINANCE OF THE CITY OF CAPE CANAVERAL, BREVARD COUNTY, FLORIDA, AMENDING CODE SECTION 110-1, DEFINITIONS, BY AMENDING THE DEFINITIONS OF HOTEL, MOTEL; PROVIDING FOR SEVERABII,ITY; PROVIDING FOR REPEAL OF CONFLICTING ORDINANCES; AND PROVIDING FOR AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF CAPE CANAVERAL FLORIDA, as follows: SECTION 1. Section 110-1, Definitions, is hereby amended by deleting the definition of "Hotel" and adopting the following in lieu thereof: Hotel means a building or combination of buildings in which lodging is provided and offered to the public for compensation and duly licensed pursuant to Ch. 509, Florida Statutes under single ownership and operation. It shall provide an inside office that shall be supervised by a person in charge at all times. There shall be a minimum of six guestrooms per building and a minimum of 150 guestrooms per hotel. As used in this definition, the term "guestrooms" means those rooms intended or designed to be used or which are used, rented or hired out to be occupied or which are occupied for sleeping purposes by guests. SECTION 2. Section 110-1, Definitions, is hereby amended by deleting the definition of "Motel" and adopting the following in lieu thereof: Motel means a building or combination of buildings in which lodging is provided and offered to the public for compensation and duly licensed pursuant to Ch. 509, Florida Statutes, under single ownership and operation. As such it is open to the public the same as a hotel, except that the buildings are usually designed to serve tourists traveling by automobile, ingress to rooms need not be through a lobby or office and parking usually is adjacent to the dwelling unit. There shall be a minimum of six guestrooms per building and a minimum of 150 guestrooms per motel. As used in this definition, the term "guestroom" means those rooms intended or designed to be used or which are used rented or hired out to be occupied or which are occupied, for sleeping purposes by guests. SECTION 3. SEVERABILITY. If any section, paragraph, phrase, or word of City of Cape Canaveral Ordinance No. Page 2 Ordinance is held to be unconstitutional or invalid, such portion shall not affect the remaining portions hereof, and it shall be construed to have been a legislative intent to pass this Ordinance without such unconstitutional or invalid part. SECTION 4. CONFLICTING PROVISIONS. Any ordinance, or parts of an ordinance, in conflict herewith is repealed. SECTION 5. EFFECTIVE DATE. This Ordinance shall take effect immediately upon its adoption. ADOPTED BY the City Council of the City of Cape Canaveral, Florida, this day of 111 Rocky Randels, MAYOR ATTEST: Sandra O. Smith, CITY CLERK Approved as to Form: Kohn Bennett, CITY ATTORNEY Existing Definitions: Hotel means a building in which lodging is provided and offered to the public for compensation and duly licensed pursuant to Ch. 509, Florida Statutes. It shall provide an inside office that shall be supervised by a person in charge at all times. tu+ldiags- There shall be a minimum of six guestrooms per building and a minimum of 1 0 guestrooms per hotel or motel. As used in this definition, the term "guestrooms" means tho e rooms intended or designed to be used or which are used, rented or hired out to be occupied or which are occupied for sleeping purposes by guests. Motel means a building in which lodging is provided and offered to the public for compensate n. As such it is open to the public the same as a hotel, except that the buildings are usually designed to serve tourists traveling by automobile, ingress to rooms need not be through a lobby or office and parking usually is adjacent to the dwelling unit. The number Of effinionnv Units iGF There shall be a minimum of six guestrooms per building and a minimum of 150 guestrooms motel. As used in this definition, the term "guestroom" means those rooms intended or desig to be used or which are used, rented or hired out to be occupied or which are occupied, sleeping purposes by guests. Meeting Type: Regular Meeting Date: 03-21-00 AGENDA Heading Considerations Summary Explanation & Background: Item 2 No. Exhibits Attached: AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: APPROVAL OF 1999 COMPREHENSIVE ANNUAL FINANCIAL REPORT DEPT./DIVISION: FINANCE/ADMINISTRATIVE Requested Action: City Council will be presented the annual audit by Bray, Beck & Koetter for City Council's approval. Summary Explanation & Background: Please bring your audit reports. I recommend approval. Exhibits Attached: N/A City Office Department FINANCE/ADMINISTRATIVE g:/a i il/mee ' /2-00/audit.doc Meeting Type: Regular Meeting Date: 03-21-00 AGENDA Heading Considerations recommended by the public works director. Item 3 No. See attached memo. AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: INTERLOCAL AGREEMENT WITH BREVARD COUNTY - FOR TRAFFIC MAINTENANCE DEPT./DIVISION: STREETS/PUBLIC WORKS SI NAL Requested Action: City Council authorize the mayor to enter into this interlocal agreement for traffic signal maintenance as recommended by the public works director. Summary Explanation & Background: See attached memo. I support staff's recommendation. Exhibits Attached: Public works director's memo of 03-08-00 City Mana 's Office Department STREETS/PUBLIC WORKS g:/a ouncil/�/03-21-00/signal.doc MEMORANDUM TO: Bennett C. Boucher City Manager FROM: Ed Gardulski Public Works Director DATE: March 8, 2000 SUBJECT: City Council Agenda Item for March 21, 2000 Brevard County Interlocal Agreement — Traffic Signal Maintenance The City of Cape Canaveral has three traffic signals within the City that Brevard County and/or its contractor provides maintenance. The City's prior contract has expired and the contractor is no longer providing service. For the past few months Brevard County has been providing maintenance service without an agreement. The fees are the same for services the City has been receiving. Funds have been budgeted and are available. The cost for this services is about $2,000 a year. Recommend the approval of Brevard County Interlocal Agreement for Traffic Signal Maintenance. Attachment CC: File BREVAR 30ARD OF COUNTY COMMISSIONERS FLORIDA'S SPACE COAST PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING, 2725 Judge Fran Jamieson Way, Bldg. A, Viera, FL 32940 Telephone: (407) 633-2077 -ax: (407) 633-2083 March 3, 2000 City of Cape Canaveral Street Division PO Box 326 Cape Canaveral, FL 32920 Re: Interlocal Agreement - Traffic Signal Maintenance Gentlemen: Enclosed for your review, approval and subsequent execution by the appropriate city officials, are four copies of an Interlocal Agreement between the County and the City of Cape Canaveral covering traffic signal maintenance for 3 signals in Cape Canaveral. The rates for these services are detailed on Attachment A of the Agreement. The standby rate was calculated using the ratio of the signals maintained on behalf of your city vs. the total number of signals maintained by the County. This proposed agreement has no expiration, but may be cancelled by either party upon 30 day's written notice. The proposed Agreement has been reviewed and approved by the Brevard County Attorney's Office. Please forward all four copies of the executed agreement to our office for subsequent execution by the Board of County Commissioners. After the Agreement has been executed by all parties, a fully executed copy of the Agreement will be returned to you for your records. PRINTED ON RECYCLED PAPER Please let us know if you need any additional information or clarification Very truly yours, R. W. Thompson, P. E. Traffic Engineering Director RWT.•mh Enclosures INTERLOCAL AGREEMENT THIS INTERLOCAL AGREEMENT made and entered into this day of by and between the City of Cape Canaveral, Brevard County, Florida, a political subdivision of the State of Florida, hereinafter referred to as "City", and the BOARD OF COUNTY COMMISSIONERS OF BREVARD COUNTY, FLORIDA, a political subdivision of the State of Florida, hereinafter referred to as "County". WITNESSETH: WHEREAS the County is in the process of advertising for bids for an agreement with a signal maintenance contractor, hereinafter referred to as "Contractor" for maintenance and construction of traffic signals within Brevard County, and WHEREAS the City desires to "piggy back" the agreement between Brevard County and its Contractor, and to have County staff perform maintenance and/or oversee the Contractor on behalf of the City, IT IS THEREFORE agreed as follows: 1. STATUTORY CITY This agreement shall be considered an interlocal agreement pursuant to the State of Florida Statutes. 2. SCOPE OF WORK The County and/or the Contractor shall provide maintenance to 3 existing traffic signals located in the City of Cape Canaveral, and to oversee the Contractor on behalf of the City. The County and/or the Contractor shall also perform other aerial maintenance tasks, i.e. maintenance on overhead signs, as requested by the City and agreed to by the County. Such aerial maintenance may be at any location under the jurisdiction of the City and agreed to by the County. It is understood that these tasks shall be performed by the County when time is available, and that signal maintenance shall take precedence over other types of aerial maintenance. It is understood that the County will perform at least one (1) preventive maintenance inspection of each City traffic signal installation annually and will relamp each traffic signal installation every other year to provide optimal service and minimize the number of maintenance calls. 3. CANCELLATION CLAUSE This Agreement may be canceled by either party upon 30 days' prior notice to the other party. Said notice shall be delivered by certified mail, return receipt requested, or in person with proof of delivery. 4. ASSIGNABILITY This Agreement is non -transferable and non -assignable in whole or part without consent of the County. 5. CONSTRUCTION OF AGREEMENT The parties hereby acknowledge that they have fully reviewed this agreement and its attachments, and have had the opportunity to consult with legal counsel of their choice, have participated in the negotiating and drafting of this Agreement and that this Agreement shall not be construed against any party as if they were the drafter of this Agreement. 6. MODIFICATION CLAUSE No modification of this Agreement shall be binding on the County or the City unless reduced to writing and signed by a duly -authorized representative of the County or City. 7. NOTICE Any and all notices required under this Agreement shall be in writing and sent to the following addresses, by US Postal Service certified, return receipt requested: Brevard County Traffic Engineering City of Cape Canaveral 2725 Judge Fran Jamieson Way, Bldg. A PO Box 326 Viera, FL 32940 Cape Canaveral, FL 32920 8. ENTIRETY CLAUSE This Agreement embodies the entire agreement and understanding between the parties hereto and there are no other agreements or understandings, oral or written, with reference to the subject matter hereof that are not merged herein. The proposed Agreement between the County and the Contractor will become a part of this Agreement and be incorporated herein. P11 9. SEVERABILITY In the event a court of competent jurisdiction determines any sentence, provision, paragraph or section of this agreement to be null and void, the remaining parts of this agreement shall continue in full force and effect as though such sentence, provision, paragraph or section had been omitted from said agreement. 10. VENUE Venue for any legal action brought by any party to this agreement to interpret, construe or enforce this agreement shall be in a court of competent jurisdiction in and for Brevard County, Florida. 11. WAIVER No delay or failure on the part of any party hereto to exercise any right or remedy accruing to such party upon the occurrence of an event of violation shall affect any such right or remedy, be held to be an abandonment thereof or preclude such party from the exercise thereof at any time during the continuance of any event of violation. No waiver of a single event of violation shall be deemed to be a waiver of any subsequent event of violation. 12. PROCEDURE A. Signal Maintenance The City shall contact the County Central Dispatch Center (Civil Defense) to request traffic signal maintenance. The County will respond to requests for maintenance and, if possible, make repairs. If repairs cannot be performed by County personnel, the County will authorize the Contractor to perform the repairs. Major repairs will not be undertaken without the approval of the City. The Contractor will submit a separate invoice for work performed on City -maintained traffic signals to the City, with a copy to the County. The County shall review the Contractor's invoice for accuracy and shall submit a payment recommendation on the Contractor's invoice. The County will submit a statement periodically to the City for maintenance work performed by County personnel. The City shall be responsible for payment of Contractor invoices directly to the Contractor. 3 B. Other Aerial Maintenance The City shall notify the County in writing, either by Notice to Proceed or City purchase order, of the work to be performed. The County will respond to requests for maintenance and perform the maintenance when time is available. 13. MAINTENANCE OF TRAFFIC The County or the Contractor shall be responsible for maintaining safe traffic flow in accordance with Florida Department of Transportation Roadway and Traffic Design Standards, 1992, and any other applicable references. In the event law enforcement is necessary to maintain traffic, the City shall, at its sole expense, arrange for law enforcement. 14. EQUIPMENT AND STOCK The City reserves the right to supply new and/or reconditioned parts to the County for installation. The City will be responsible for the installation of any necessary telephone drops in the master cabinet and shall pay the monthly charges for such telephone drops. 15. AUTHORIZED PERSONNEL The personnel authorized by the City and the County to perform maintenance shall be limited to the County's Traffic Systems Technician(s), the County's Traffic Sign/Signal Technician(s) and the Contractor or any other personnel agreed upon by the City and the County in an emergency. The charges for the services of such emergency personnel shall be computed using the rate on the attached schedule which is closest to the actual expenses of that employee, and shall not exceed the highest rate in the attached schedule. 16. COMPENSATION The City shall compensate the County for maintenance in accordance with Attachment A and shall compensate the Contractor in accordance with the agreement between the County and the Contractor. Compensation will be made to the nearest one-half hour and may include travel time to the work site, but shall not include return travel time. The County's compensation schedule may be adjusted upon thirty (30) days' written notice to the City. The Contractor's compensation schedule may be adjusted in accordance with the Agreement between the County and the Contractor. Compensation adjustment shall be based on material cost variation or other relevant economic conditions, sufficiently documented by the 4 requesting party. Either party may request a compensation adjustment. Failure to agree upon compensation adjustments shall constitute mutually agreed upon termination of this Agreement. Regular time work shall be work that was requested between the hours of seven thirty o'clock (7:30) a. m. and four o'clock (4:00) p. m., Monday through Friday. Overtime work shall be work that was requested during those hours not defined as regular time. Holidays will be charged at the overtime rate. Holidays are defined as those days officially designated as holidays by the Brevard County Board of County Commissioners. Work that is initiated during regular time, completed during overtime, and required effort during overtime to complete, will be partially compensated at the overtime rate, based upon the prorated share of work completed during overtime. The City shall pay to the County the actual cost of all materials furnished by the County, associated with maintenance activities, which are an integral part of the finished work. Standby personnel are assigned to respond to all after-hours calls for the County and the City. Due to the number of traffic signals within the County system and the City systems, there may be times that it is more beneficial to the County and City to have an additional Traffic Signal Technician on call to provide timely response. In the event it becomes necessary to place a second employee on call, the standby rate would double for that period of time and the cost would be shared on a pro rata basis. IN WITNESS WHEREOF, the parties hereto have set their hands and seals the day and year first above written. ATTEST: BOARD OF COUNTY COMMISSIONERS OF BREVARD COUNTY, FLORIDA Sandy Crawford, Clerk ATTEST: Nancy N. Higgs., Chairman As Approved by the Board on CITY BREVARD COUNTY, FLORIDA 5 *Standby *This is our standby cost, calculated by using the average of the three signal tech positions. This would have to be calculated for each municipality according to their percentage of the total number of signals. Average Standby Cost 28.005/hr x 2 hrs/day= $56.01 Cost per day per signal 0.1867 ATTACHMENT A Effective October 1, 1999 PERSONNEL REGULAR TIME OVER TIME PER HOUR PER HOUR Traffic Sign/Signal Tech. $20.61 $30.72 Traffic SystemsTech. I $18.39 $27.41 Traffic SystemsTech. II $22.94 $34.24 Traffic SystemsTech. III $33.07 $49.27 Vehicle Per Call $20.00 *Standby *This is our standby cost, calculated by using the average of the three signal tech positions. This would have to be calculated for each municipality according to their percentage of the total number of signals. Average Standby Cost 28.005/hr x 2 hrs/day= $56.01 Cost per day per signal 0.1867 Meeting Type: Regular Meeting Date: 03-21-00 AGENDA Heading Considerations as recommended by the public works director. item 4 No. • Appropriate $36,358 from General Fund Reserves AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: STORMWATER SYSTEM REPAIRS DEPT./DIVISION: STREETS/PUBLIC WORKS Requested Action: City Council authorize an appropriation of $36,358 to Griner's Pipeline Service for stormwater system repairs as recommended by the public works director. Summary Explanation & Background: The public works director is requesting the following be approved by the City Council: • Appropriate $36,358 from General Fund Reserves • Waiving the bid process based on possible failure of drainage system in this area • Award repair work to Griner's Pipeline Service, Inc. I support staffs recommendation. Exhibits Attached: Public works director's memo of 03-08-00 City M 's Office Department STREETS/PUBLIC WORKS g:/a ncil/ eet -21-00/stonnwater.doc M E M O R A N D U M TO: Bennett C. Boucher City Manager FROM: Ed Gardulski j Public Works Director DATE: March 8, 2000 SUBJECT: City Council Agenda Item for March 21, 2000 Cleaning and lining of Stormwater Pipe by Griner's Pipeline Services, Inc. During the rainy periods during the last storm season the City of Cape Canaveral experienced structure problems with its Stormwater collection system in the Harbor Heights Subdivision. The problem areas are under driveway and through residential side yards. The best means for repairs of these structures is to clean and slip line the pipe. Attached is a drawing depicting the location of the problem area. The Public Works Department has scheduled to have Griner's Pipeline Services to perform sanitary sewer repairs within the City. This work is being performed through a cooperative purchase with the City of Orlando. During this same time period repairs to the stormwater collection system can be made within the Harbor Heights subdivision. Griner's Pipeline Service has agreed to clean and line 371 feet of stormwater pipeline. The estimated cost for slip lining is $36,358. Funds need to be appropriated. The City of Cape Canaveral had utilized Griner's Pipeline Services last year for emergency cleaning and repairs. The quality of workmanship of Griner's Pipeline Services is satisfactory. Recommend approving the service from Griner's Pipeline Services, Inc. in the amount of $36,358, the appropriation for the necessary funds and waving the bidding process. Attachments CC: Walter Bandish, Kay McKee File r� February 10, 2000 Mr. Walter Bandish City of Cape Canaveral 600 Tower Boulevard Cape Canaveral, Florida 32920 Griner's Pipeline Services RE: Proposal for the installation of polyethylene slipliner in existing elliptical corrugated metal storm drain between Coral Drive and Harbor Drive. Mr. Bandish, Pursuant to our site inspection and your meeting with our representative, Harold Richmond, please accept the following as our proposal for the above referenced project. ITEM # ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE ITEM TOTAL 1 Sli line Section 1 ECMP 123.0 L.F. $ 98.00 $ 12,054.00 2 Sli line Section 2 ECMP 30.0 L.F. 98.00 2,940.00 3 Sli line Section 3 ECMP 218.0 L.F. 98.00 21,364.00 TOTAL COST 371.0 L.F. $ 36,358.00 The scope of work consists of excavating an insertion pit adjacent to the manhole for the 123 linear foot section off of Coral Drive. Following the excavation of the pit, 10 -foot sections of ADS N-12 will be connected together and winched into place through the existing elliptical corrugated metal pipe until the desired length has been installed. The ends of the installed slipliner will then be cemented into place while installing PVC pump risers. A flowable cement grout will then be pumped through the pump risers to fill the annular space between the existing pipe and the new slipliner. Preliminary cleaning of the existing pipe and television inspection both before and after the liner installation is included in the unit prices shown above. The City of Cape Canaveral shall provide the following items for use by Griner's Pipeline Services at no charge: 1. Water for pipe cleaning via a standard fire hydrant connection. 2. Dumpsite for debris removed via pipe cleaning operation. 3. Notification of residents in homes adjacent to applicable storm drainage lines. 4. Access to intended work areas. 5. Any necessary local licenses and/or permits. Terms of payment are net due within thirty (30) days of invoice. If you have any questions, please contact me and I will assist in any way possible. Thank you for your continued patronage. Sincerely, M. Robert Garrison General Manager An ® Company www.adsenv.com 21902 State Road 46 - Mount Dora, Florida 32757-9300 - (352) 383-1222 - FAX (352) 383-6607 m "V 34 VO; 2a ve Meeting Type: Regular Meeting Date: 03-21-00 AGENDA Heading Considerations Carl Hankins, Inc. in the amount of $16,402.50 as recommended by the public works director. Item 5 No. of Washington avenue, approximately 730 feet, at the bid price of $22.50 per linear foot AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: APPROVAL - WASHINGTON AVENUE SIDEWALK CONSTRUCTION TO CARL HANKINS, INC. DEPT./DIVISION: STREETS/PUBLIC WORKS Requested Action: City Council consider authorizing the appropriation and construction of the Washington Avenue sidewalk to Carl Hankins, Inc. in the amount of $16,402.50 as recommended by the public works director. Summary Explanation & Background: See attached memo from the public works director. This is to construct a sidewalk on the southern part of Washington avenue, approximately 730 feet, at the bid price of $22.50 per linear foot I support staff's recommendation. Exhibits Attached: Public works director's memo of 03-09-00 City Man 's Offices Department STREETS/PUBLIC WORKS g:/ad ncimN e2ttfi W-21-W/stdewaix.doc MEMORANDUM TO: Bennett C. Boucher City Manager / FROM: Ed Gardulski ��� Public Works Director DATE: March 9, 2000 SUBJECT: City Council Agenda Item for March 21, 2000 Sidewalk Construction, Carl Hankin's Inc. Currently the City of Cape Canaveral has awarded the Bid for the construction of its reclaimed water system to Carl Hankins' Inc. Within Bid 99-03 a line item for sidewalk construction was provided in the amount of $22.50 per linear foot. The Contractor has agreed to construct additional sidewalk within the City for the bid amount price. This work is to be performed during the restoration phase of the reuse construction project. City Council had requested that sidewalk improvement be made along Washington Avenue to the elementary school. The work will require 729 linear feet of sidewalk along the south right-of-way line of the street. The total cost for this construction will be $16,402.50. The project is within the scope of the City's Prime Path goal established in 1994. Attached is a copy of the City's Prime Path sidewalk plans. Capital Funds have been budgeted in the amount of $10,000. Recommend the approval of sidewalk construction by Carl Hankins Inc. in the amount of $16, 402.50 and the appropriation of the necessary additional funds. Attachments cc: File City of Cape Canaveral PRIME PAT11j ...... cLulcjcjw IIAY__- OCEAN WOODS AREA c S �n (1 to N_n �_ I'� I1fl1YN1 C/IUI(AJIM I NORTH—SOUTiI SR AIA SR 901 - ORANGE AVENUE ROSALIND AVENUE RIDGEWOOD AVENUE- EAST—WEST CENTRAL BOULEVARD` WASHINGTON AVENUE MONROE AVENUE POLK AVENUE- BUCHANAN AVENUE LLXJ vMN u ULAMA—.._ J R11tG LUI GPLINI,. ANILR IAIIUIN_..___._ GNMn.. _ 11N:i,�IA: II)G K;l0.i —._LU(� �) y MLAII _ (x;CNIGN21>LN - -----------................. AA. _ -- rye?Af- CN'L',SIIOI tu;�y ..---..._ I 1 u ULAMA—.._ J R11tG LUI GPLINI,. ANILR IAIIUIN_..___._ GNMn.. _ 11N:i,�IA: II)G K;l0.i 911 Street N Y —._LU(� �) y MLAII _ AA. _ CN'L',SIIOI S_...._. ..---..._ C/Vti 51IL(tC5_ 911 Street N Y m md CITY OF CAPE CANAVERAL 1999-00 FISCAL YEAR BUDGET DETAILED FIVE-YEAR CAPITAL PURCHASES (1) (2) (3) (4) (5) DEPARTMENT/PROJECT FY 99100 FY 00/01 FY 01/02 FY 02/03 FY 03/04 ADMINISTRATION: TECHNOLOGY ADVANCEMENT (I,G,M,N) 10,000 10,000 10,000 10,000 10,000 REPLACE COPIER (G,I) 13,000 COMPUTER NETWORK IMAGING SYS. (I,G,M,N) 20,000 TOTAL ADMINISTRATION DEPARTMENT REQUESTS: 23,000 30,000 10,000 10,000 10,000 SHERIFF'S DEPARTMENT: FULLY EQUIPPED REPLACEMENT VEHICLES (G) 73,050 47,333 47,333 47,333 47,333 CAMERA DIGITAL VIDEO IMAGING (G) 700 THREE REPLACEMENT COMPUTERS (G) 4,800 STINGER SPIKE SYSTEMS (0) 900 MIBILE DATA TERMINALS (0) 18,300 STALKER RADAR (G) 6,900 FULL SIZE AUDIO TAPE DUPLICATOR (0) 950 (1) REPLACEMENT COPY MACHINE (G,I) 10,000 TOTAL SHERIFF'S DEPARTMENT REQUESTS: 105,600 57,333 47,333 47,333 47,333 FIRE DEPARTMENT: FIRE FIGHTING EQUIPMENT (1) 55,000 21,000 22,000 23,000 24,000 STAFF REPLACEMENT VEHICLES (G,I) 15,000 10,000 NEW RESCUE VEHICLE (G,I,P) 75,000 1/2 QUINT PUMPER (G) 300,000 TOTAL FIRE DEPARTMENT REQUESTS: 130,000 36,000 22,000 33,000 324,000 BUILDING DEPARTMENT: LIGHT DUTY PICK-UP TRUCK (G,I) 14,000 TOTAL BUILDING DEPARTMENT REQUESTS: - - - 14,000 - STREET DEPARTMENT: HEAVY DUTY PICK-UP TRUCK (G,I) 17,000 TOWER BLVD. PAVING (G,S)` 92,563 STORMWATER MASTER PLAN (G) 43,500 LIGHT DUTY PICK-UP TRUCK (G) 12,500 ROOF REPAIRS STREET BUILDING (G) 10,000 SIDEWALKS (S)000 0 DUMP TRUCK (G,I) _,__.. - 20,000 20,000 MOWER (C,G,1) 8,800 STORMWATER OUTFALL UPGRADE (G,M) 40,000 40,000 40,000 KABOTA TRACTOR/MOWER (C,G,I) 8,000 TOTAL STREET DEPARTMENT REQUESTS: 156,063 37,000 80,500 40,000 48,800 90 ITEN 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. ,:,r crape Canaveral Reclaimed (Re -Use) Water Line Extension of Cape Canaveral, Florida BID SCHEDULE QTY UNIT DESCRIPTION 11NIT DQIr`n 1 1 1 1 2,142 4,038 2 2 1 8 17 1 1 2. 2 1 2 8 6 2 L. L. L.S L.S L.F. L. F. EA. EA. EA. EA. EA. EA. EA. EA. EA. EA. EA. EA. EA. EA. EA. 22• 2 EA. 23• 4 EA. 24. 5 25. 1 26. 54 27. 58 28. 4 29. 4 30. 25 31. 75 EA. EA. EA. EA. EA. EA. L.F. L. F. 32. 400 S. F. S• Mobilization ' S• Construction Survey Traffic Maintenance Re -Use Line Testing 6" PVC 4" PVC 6"x6"Tee 6" x 4" Cross 6" x 4" Tee 6" x 4" Reducer 6" Gate Valve 4" Gate Valve 4" x 4" Tee 6" x 90° Bend 6" x 45° Bend 6" x 22-1/2° Bend 4" x 90° Bend 4" x 45° Bend 4" End Cap 2" Blow -Off Assembly Remove =vi +; b $ 20_ , 445_00 $ 5,46n W $-1,57g p0 $ 3,gp0.00 $ 24.50 ____ S 368_00 $ 413.00 $ 9A_n0 $ 687.00 $ 571.00 $ 42().00 $-- 304.00 $_ 291_00 -2g� $ ^0 $--�0 $ 258.00 $ 223:00 $ __55 00 s ing low -off Assy. & Connect new 6" Reuse Main (Note 1) $ 655.00 Remove Existing 6"x90° Bend. Install new 6"x6" tee, & Connect to Existing/new 6" Reuse Main (Note 2) $ , 7MA o0 Detail A_: 6"x4" Cross/Storm Drain Pipe Crossing w•6" End Caps (Note 3) $__2,338.00 D tail B: 6" x 4" Cross/Storm Drain Pipe Crossing & Cut -in to Existing 6" Re -Use (Note 3) $ 2,338.00 Existing 4" Re -Use Main Connection $ 504.00 Re -Use Service Connection -- (Single) (1 ") (Long Service) $ 336.00 Re -Use Service Connection (Single) (1 ") (Short Service) $ Re -Use Service Connection 276.00 (Double) (1 ") $ 425.00 Re -Use Service Connection -- (Single) (2") • JJVJ rnll,C S ^--- 20,445.00 $ 5,460 00 $ 1,578.00 S 3,800.00 $ 52,479.00 $�5 0. S_ 736.00 $____.826. 00 $----- 1 2_1QD0 $----229. '$- 55=_00 $ L9,707.00 $ -_ 22. $ 304.00 $ 582.00 $ 5A2 cx0 $ 26_i_00 $ 516_00 $ 1,784.00 $_ 3,396 00 $ 1,310.00 $ 9,352.00 $ 11,690.00 $ 504.00 $ 18,144.00 $_ 16,008.00 $ 1,700.00 Concrete Sidewalk Removal & $ 559'00 $ 2,236.00 Replacement (See Note 4) Concrete Curb & Gutter Removal `� 22.50 J $ 562.50 & Replacement (See Note 4) $ -' $ Concrete Driveway Removal &0 1,462.50 Replacement (See Note 4) $ 6.15 T $ 2,460.00 BID 00300-3 Meeting Type: Regular Meeting Date: 03-21-00 AGENDA Heading Considerations No. 2 to SSA in the amount of $13,981. Item 6 No. I support staff's recommendation. AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: CONTRACT ADMINISTRATION AND INSPECTION SERVICE FOR RE USE PROJECT PHASE III, NO. 2 DEPT./DIVISION: RECLAIMED WATER/PUBLIC WORKS Requested Action: City Council consider approval of contract administration and inspection services for reuse project phase III, No. 2 to SSA in the amount of $13,981. Summary Explanation & Background: See attached memo from the public works director. I support staff's recommendation. Exhibits Attached: Public works director's memo of 03-16-00 City Man is Office Department RECLAIMED WATER/PUBLIC WORKS a uncil/ eetin / -21-00/ssa.doc MEMORANDUM TO: Bennett C. Boucher City Manager FROM: Ed Gardulski (�& Public Works Director DATE: March 16, 2000 RE: City Council Agenda Item for March 21, 2000 Contract Administration and Inspection Service for the Reclaimed Water Phase III Extension Part 2 by Stottler Stagg and Associates. The City of Cape Canaveral Council awarded the Change Order to Phase III part 2 to Carl Hankins Inc., for the construction of the Reclaimed Water Phase III Extension. Attached is a proposal from SSA for the contract administration and inspection service that is recommended for a project of this extent. SSA was the design engineer of this project and have satisfactory performed contract administration and inspection service for other City of Cape Canaveral reclaimed water projects. Funds are available within the Enterprise Impact Fund for this project. This project is 100% funded by the City of Cape Canaveral without the aid of matching grants. SSA's fees are based on an hourly rate and will invoice on actual work performed. Recommend the approval of contact administration and inspection service from SSA in the amount not to exceed $13,981 and to appropriate the necessary funds. Attachment CC: Sandra Sims, City Clerk File - U V L March 1, 2000 Mr. Ed Gardulski City of Cape Canaveral 105 Polk Avenue Cape Canaveral, FL 32920-0326 SSA RE: SSA Fee Proposal for Construction Inspection Services for Phase 3 Segment 2 Re -Use Water Line Dear Ed: Per your request, SSA is pleased to present our fee proposal for construction inspection services of the Phase 3 Segment 2 Re -Use Line program. In general, SSA will perform contractor coordination and on-site inspection services on a part-time basis (20± hours per week for 10 weeks, 200± hours total) and will also provide record drawings of completed work. SSA specific scope of services will be as follows: SSA SCOPE OF SERVICES Task 1 - Inspection: SSA's Construction Inspector will observe on-going work to coordinate for the City that construction is in accordance with design drawings and specifications. Daily inspection reports and photographs will be provided for inspection activities. SSA will also hold pre -construction and weekly meetings with the Contractor. Task 2 — Design Extension: SSA will design an extension of Banana River Blvd. for the reuse system. This line will be added to the Phase 3 Part 2 construction package. SCHEDULES AND FEES Schedules: Upon receipt of written authorization to proceed SSA will coordinate schedules with the contractor and the City. Once construction starts, it is anticipated that Task 1 will be completed within two and one half (2-112) months. Fees: SSA's fee for Task 1 and 2 will be aiM sum of $13,981.00. SSA's fee is broken down as follows: Project Engineer: 8 hours x $82.00 = $656.00 Field Engineer: 200 hours x $65.00 = $13,000.00 Design Engineer: 5 hours x $65.00 = $325.00 Print costs and photos have been included in the iampnw fee. Fees will be billed monthly and payment will be due within thirty (30) days of receipt. Additional work authorized in writing by the City that is not specifically included in this proposal, such as follow-up coordination work with land owners, contractor special meetings (such as claims), etc., will be deemed as additional services upon City's written authorization to proceed and will be billed at SSA's STOTI1ER STAGG & ASSOCIATES ARCHITECTS • ENGINEERS • PLANNERS, INC. CORPORATE OFFICE: 8680 North Atlantic Ave. P. O. Box 1630 Cape Canaveral, FL 32920 Tel 321-783-1320 Fax 321-783-7065 Lic. #AAC000329 #EB0000762 #LB0006700 cici+iAprojecWproposaWgarcMski phase 3 segment 2 inspection reuse.doc Mr. Ed Gardulski March 1, 2000 SSA Fee Proposal Page 2 Construction Services for Phase 3 Segment 2 Re -Use Water Line standard hourly rates or negotiated as a imp -sum prior to beginning work. Out-of-pocket expenses for hourly work and additional printing will be billed with a fifteen percent (15%) mark-up. Compensation rates are based on ordinances, regulations and procedures in force on the execution date of this Agreement by the appropriate governing bodies having jurisdiction over the project Any significant modification in these ordinance, regulations, procedures, etc. shall be justification for re -negotiation for the compensation due to the Consultant for the work involved. It is understood that any and all professional liabilities incurred by SSA throughout the course of rendering professional services on this project shall be limited to a maximum of the net fee received by SSA, not including reimbursable expenses and sub -consultants, for all services rendered on the project. Should it become necessary to obtain a third party to collect our fees for services, the City hereby agrees to pay all costs of such collections including Attorney's fees. The City and SSA respectively bind themselves, their partners, successors, assigns and legal representative to the other party to this Agreement and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants to this Agreement. Neither the City nor SSA shall assign, sublet or transfer any interest in this Agreement without the written consent of the other. The terms and conditions of this proposal are effective through April 30,2000. Acceptance after this date may necessitate increased fees or altered conditions. Ed, your authorization of this proposal can be accomplished by the appropriate City signature below and our receipt of a signed copy. SSA is looking forward to working with the City on this continuing project in Cape Canaveral. Thanks. Sincerely, Stottler Stagg & Associates Architects, Engineers, Planners, Inc. ACCEPTANCE: M. John A. Pekar, PE Vice President TITLE: JAP JIs DATE: c:lciuihprojects1proposa'tp-gardAski phase 3 segment 2 kWection reme.doc Meeting Type: Regular Meeting Date: 03-21-00 AGENDA Heading Considerations the amount of $139,012 to Griner's Pipeline Services, Inc. as recommended by the public works director. Item 7 No. sewer system. AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: COOPERATIVE PURCHASE OF SANITARY SEWER LINING AND REHABILITATION DEPT./DIVISION: WATER RECLAMATION/PUBLIC WORKS MANHOLE Requested Action: City Council consider approval of a cooperative purchase of sanitary sewer lining and manhole rehabilitation in the amount of $139,012 to Griner's Pipeline Services, Inc. as recommended by the public works director. Summary Explanation & Background: See attached memo from the public works director. This is staff's continuing effort to rehabilitate the sanitary sewer system. I support staff's recommendation. Exhibits Attached: Public works director's memo of 03-08-00 City M •' Office Department WATER RECLAMATION/PUBLI WORKS g�councuimeeu iAg ,fid t isewer.aoc M E M O R A N D U M TO: Bennett C. Boucher City Manager FROM: Ed Gardulski Public Works Director DATE: March 8, 2000 SUBJECT: City Council Agenda Item for March 21, 2000 Cooperative Purchase with the City of Orlando for Sanitary Sewer Lining and Manhole Rehabilitation; Griner's Pipeline Services, Inc. As part of the City's Sanitary Sewer line rehabilitation program, each year funds are budgeted for repairing the sewer collection system. This program entails the cleaning, televising, and repairing and/or replacing of sewer lines as required. Two years ago the collection crew had identified problem areas and developed a five -(5) year plan for cleaning and televising its sanitary sewer system. As part of this year's rehabilitation program we are scheduling to perform lining of 3,666 feet of sewer line. The estimated cost for slip lining is $117,312. Additional $11,250 is requested to perform the necessary repairs to 15 manholes. The total estimated cost for this year's scheduled work is $128,562. In addition, the sanitary sewer line under Chandler has failed. This additional emergency repair will cost to reline 275 feet of 10" pipe is $10,450. The total amount that is required for this year's work is $139,012. The purchase of this service will be through a cooperative bid with the City of Orlando, Bid No. B199-13 10, awarded to Griner's Pipeline Services, Inc. This annual service is valid through October 14, 2000. The City of Cape Canaveral had utilized Griner's Pipeline Services last year and found the quality of workmanship satisfactory. A total of $130,000 has been budgeted for the sewer line rehabilitation program for this budget year. In addition, a carry over from last fiscal year in the amount of $84,223.55 from Purchase Order 15155 was requested. This work is currently in progress and has been assigned to Purchase Order 15554. The total available funds for this year should be $214,223.55. Recommend approving the cooperative purchase with the City of Orlando for service from Griner's Pipeline Services, Inc. in the amount of $139,012 and the appropriation of the necessary funds. Attachments CC: Walter Bandish, File r� February 21, 2000 Griner's Pipeline Services Mr. Walter Bandish City of Cape Canaveral 600 Tower Boulevard Cape Canaveral, Florida 32920 RE: Projected Lining for 2000 Mr. Bandish, Please accept the following as our pricing for the projected lining this year as based on a contract with the City of Orlando. ITEM # ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE ITEM TOTAL 1 Line MH 117-27 to 117-28 195 LF $32.00 $6,240.00 2 Line MH 117-28 to 117-32 380 LF $32.00 $12,160.00 3 Line MH 115-3 to MH115-4 402 LF $32.00 $12,864.00 4 Line MH115-4 to MH115-5 317 LF $32.00 $10,144.00 5 Line MH 115-5 to MH 115-6 396 LF $32.00 $12,672.00 6 Line MH 115-18 to MH 115-19 350 LF $32.00 $11,200.00 7 Line MH 115-19 to MH 115-20 375 LF $32.00 $12,000.00 8 Line MH 115-25 to MH115-26 352 LF $32.00 $11,264.00 9 Line MI -11 15-26 to MI -11 15-27 402 LF $32.00 $12,864.00 10 Line MH115-29 to MH115-30 252 LF $32.00 $8,064.00 11 Line MI-1115-30to MH115-31 245 LF $32.00 $7,840.00 TOTAL 3,666 LF $117,312.00 The City of Cape Canaveral will provide the following to Griner's at no charge: 1. Water for Pipe Cleaning via a standard fire hydrant 2. Dumpsite for debris 3. Notification of residents 4. Access to Jobsite 5. Any necessary licenses and/or permits If you have any questions or need further information, please contact me. Thank you. Sincerely, �� M. Robert Garrison General Manager An ® Company www.adsenv.com 21902 State Road 46 - Mount Dora, Florida 32757-9300 - (352) 383-1222 - FAX (352) 383-6607 r� Date February 18, 2000 Walter Bandish Griner's Pipeline Services City of Cape Canaveral 600 Tower Blvd Cape Canaveral, Fl. 32920 Walter, Enclosed you will find the Invitation to Bid — Annual Agreement for Sewer Lining and Manhole Rehabilitation, for the City of Orlando. If you have any question, please do not hesitate to call. Sincerely, ) Q Gina Ashby An ® Company www.adsenv.com 21902 State Road 46 • Mount Dora, Florida 32757-9300 • (352) 383-1222 • FAX (352) MAR -16-00 11:31 AM CAPE CANAVERAL PW 407 799 4980 P.Oi Agreement for Sanitary Sewer Lining and Manhole INVITATION TO BID N Bl" -1310 ANNUAL AGREEMENT FOR SANITARY SEWER LINE AND ar MANHOLE REHABILITATION THIS AGREEMENT, made this 30 day of September, 1999, by and between the City of Orlando, a municipal corporation existing under the laws of the State of Florida, hereinafter referred to as the "City" and Griner's Pipeline Services, Inc., hereinafter referred to as the "Contractor", for the term specified herein, with the City having the option of extending this Agreement for another period of time, upon a mutual agreement of the parties, agree as follows: WITNESSETH: I. SCOPE The Contractor is to perform the Work as defined in the Invitation to Bid and amendments, if any, the Invitation to Bid and any amendments thereto being attached hereto as Exhibit "A", incorporated by reference herein and made a part thereof as fully as if herein set forth. Unless otherwise specified herein, the Contractor is to furnish all materials, tools, equipment, manpower, and consumables to complete the Work. Specifically, the Contractor is hereby awarded Items 3 through 26, as Secondary Contractor. 11. TERM OF AGREEMENT The period of this Agreement shall be for twelve (12) months, beginning on October 15; 1999 and ending on October 14, 2000. This Agreement may, by mutual written assent of the parties, be extended for two (2) additional twelve (12) month periods or portions thereof, up to a cumulative total of thirty-six (36) months. III. COMPENSATION The Contractor agrees to provide the services, equipment and materials as specified in its bid to the City at the cost specified in said bid and amendments, if any, the bid and any amendments thereto being attached hereto as Exhibit "B", incorporated by reference herein and made a pan hereof as fully as if herein set forth. The amount as specified in Exhibit "B", may be increased or decreased by the City under the Extra Work provision of this Agreement, through the issuance of an Addendum, if applicable. Any prices specified in this Agreement or Addendum thereto, will remain firm for the term of this Agreement or Addendum. Office of Purchasing and Materials Management (SAACS) Page: 57 MAR -16-00 11:32 AM CAPE CANAVERAL PW 407 799 4980 P.0 .nnual Agrecinent for Sanitary Sewer Lining And Manhole Rehabliitatlon INVITATION TO iilD N 13199-i3' INVITATION TO BID You are invited to Bid on the following: Annual Agreement for Sanitary Sewer Line, Manhole Rehabilitation and Root Control Item No. Quantity Unit Unit Description Price Tol al The bid amounts specified herein are for fixed price work which includes all prices for equipment, labor and material required to perform the work specified in this Invitation to Bid. The Bidder, having examined carefully the Specifications consisting of five (5) Specifications and 27 pages, terms and conditions herein, proposes to furnish all labor. materials, equipment and other items, facilities and services, without exception for the proper execution and completion of the contract, and if awarded the contract, to complete the said work within time limits as specified for the following bid prices. I . FOB Point Deliverd onix Total Bid (this page) 2. Terms of Payment (e.g. Net 30) 21 10 days., s 3. The City shall receive shipment or project completion notice within _ days from the date Vendor receives Official Purchase Order or Notice to Proceed. Recheck your quotations prior to submission. Bids may not be changed after being opened OfTee or Purchasing and Materials Management Page: 10 Group I The Purchase and Installation of R1CP - Lining I FT 4 in. pipe, for job sizes from 1 ft. to 1,000 ft. $ No Bid $ 2. FT 4 in. pipe, for job sizes from 1001 11. or more. $ No Bid $ 3. FT 6 in. pipe, for job sizes from 1 ft. to 1,000 ft. S 36.00 $ S33.00 4• Fr 6 in. pipe, for job sizes from 1001 ft. or more. S 5. FT 8 in. pipe, for job sizes from 1 ft. to 1,000 ft. $ 35.00 $ I . FOB Point Deliverd onix Total Bid (this page) 2. Terms of Payment (e.g. Net 30) 21 10 days., s 3. The City shall receive shipment or project completion notice within _ days from the date Vendor receives Official Purchase Order or Notice to Proceed. Recheck your quotations prior to submission. Bids may not be changed after being opened OfTee or Purchasing and Materials Management Page: 10 MAR -16-00 11:32 AM CAPE CANAVERAL PW 1. A,,,.l AQrtetntnt for Sanitary Sewn. Lining 2nd Msnhals (ehsbilitstion 407 799 4980 P.0 _.. .: ATION TO BID 0 11I99-1310 INVITATION TO BID You are invited to Bid on the following: Annual Agreement for Sanitary Sewer Line, Manhole Rehabilitation and Root Control Item Unit No. Quantity Unit Description Price Total 6. FT 8 in. pipe, for job sizes from 1,001 ft. or more. $33,00- $ 7. FT 10 in. pipe, for job sizes from I ft. to 1,000 ft. $ 38.04 S S. FT 10 in. pipe, for job sizes from 1,001 ft. or more. S�Oo S 9. FT 12 in. pipe, for job sizes from 1 R. to 1,000 A. $ 48.00 S 10. FT 12 in. pipe, for job sizes from 1,001 ft. or more. S 45 • t)0 S 11. FT 18 in. pipe, for job sizes from 1 ft. to 1,000 ft. S-7-4- QO $ 12. FT 18 in. pipe, for job sizes from 1,001 ft. or more. S72.00 S 13. FT 24 in. pipe, for job sizes from 1 ft. to 1,000 ft. S120.00 $ 14. FT 24 in. pipe, for job sizes from 1,001 ft. or more. S111-50 $ . Group II The Purchase and Installation of Polyvinyl Chloride Pipe Lining 15. FT 4 in. pipe, for job sizes from 1 ft. to 1,000 ft. $No Bid $ 16. FT 4 in. pipe, for job sizes from 1,001 ft. or more. $ No Bid $ 17. FT 6 in. pipe, for job sizes from 1 ft. to I,000 A. $ 32.00 S 18. FT 6 in. pipe, for job sizes from 1,001 ft. or more. $11.t 00 $ I. FOB Point ]Delivered Bid anis page))elivered Only _ 2. Terms of Payment (e.g. Net 30) 2% 10 days • net 30 days 3. The City shall receive shipment or project completion notice within 45 days from the date Vendor receives Official Purchase Order or Notice to Proceed. Recheck your quotations prior to submission. Bids may not be changed after being opened UfrKe of Purchasing and Malcrials Maurgentenl 1'sge: I1 MAR -16-00 11:33 AM CAPE CANAVERAL PW ,hnuat Agreement for Sanitary Sewer Lining and Manhole Itehabilitation 407 799 4980 P.0 INVITATION TO BID N BI99-131 INVITATION TO BID You are Invited to Bid on the following: Annual Agreement for Sanitary Sewer Line, Manhole Rehabilitation and Root Control Item Unit No. Quantity Unit Description Price Total 19• FT 8 in. pipe, for job sizes from 1 ft. to 1,000 ft. $ 32.00 S_„�_ 20. FT 8 in. pipe, for job sizes from 1,001 ft. or more. $ 31.00 Ste_ 21. FT 10 in. pipe, for job sizes from 1 ft. to 1,000 ft. $ 36.00 S —:: 22. FT 10 in. pipe, for job sizes from 1,001 ft. or more. S34.50 S 23. FT 12 in. pipe, for job sizes from 1 ft. to 1,000 ft. $46.00 S__� 24. FT 12 in. pipe, for job sizes from 1,001 ft, or more. $44.50. S 25. FT 18 in. pipe, for job sizes from 1 ft. to 1,000 ft. SNo Bid S 26• FT 18 in. pipe, for job sizes from 1,001 ft or more.. Sxo Bid Ste_ Group III The Purchase and Installation of Polyethylene Pipe Lining 27, FT 4 in. pipe, for job sizes from 1 ft. to 1,000 ft. $No Bid $ 28. FT 4 in. pipe, for job sizes from 1,001 ft. or more. $xo sid $ 29. FT 6 in. pipe, for job sizes from 1 ft. to 1,000 ft. $No Bid $ 30. FT 6 in. pipe, for job sizes from 1,001 ft. or more. $xo Bid S,�rT 31. FT 8 in. pipe, for jab sizes from I ft. to 1,000 ft. $No Bid $_ 32. FT 8 in, pipe, for job sizes from 1,001 ft. or more. $No Bid $_ 33. FT 10 in. pipe, for job sizes from 1 ft. to 1,000 ft. $No Bid S�,_ 34. FT 10 in. pipe, for job sizes from 1,001 ft. or more. SNo Bid S I. FOB Point 12elivered Only Total Bid (this page) 2. Terms of Payment (e.g. Net 30) _ 2% 10 days; net 30 days 3. The City shall receive shipment or project completion notice within 45 days from the date Vendor receives Official Purchase Order or Notice to Proceed. Recheck your quotations prior to submission. Bids may not be changed after_ being opened Office of Purchasing and Materials Management Page: 12 MAR -16-00 11:33 AM CAPE CANAVERAL PW 407 799 4980 P.0 ,,Aust Agreement for Sanitary Sewer Lining and Manhole ATION TO BID 0 BIWI3 ,telsiDititstion INVITATION TO BID ou are invited to Bid on the following: Annual Agreement for Sanitary Sewer Line Manhole Rehabilitation and Root Control Item EA Liner installation for, 42 in. manhole, per vertical foot of vuIa S. No. Quantity Unit Description Price 35. FT 12 in. pipe, for job sizes from 1 ft. to 1,000 ft. S No bid S 36. FT 12 in. pipe, for job sizes from 1,001 ft. or more.. S No Bid S 37, FT 18 in. pipe, for job sizes from 1 ft. to 1,000 R. S No S 38. FT 18 in. pipe, for job sizes from 1,001 ft. or more. S No Bid S Group IV The Purchase and Installation of Prefabricated Fiberglass Liners 39. EA Liner installation for, 42 in. manhole, per vertical foot of $124.0 S. installation. 40. EA Liner installation for, 48 in. manhole, per vertical foot of $ 576.00 $ installation. 41. EA Liner installation for, 54 in, manhole, per vertical foot of $ 648.00 $ installation. 42. EA Liner installation for, 60 in. manhole, per vertical foot of $ 720.00 $ installation. Group V The Purchase and Installation of RICIP - Point Repair 43. EA RICIP point repair 5 feet long (1 standard leg or sleeve) for $ 2.785.S 6 -in. size. 44. EA I RICIP point repair 5 feet long, (1 standard leg or sleeve) $ for 8 -in. size. Total Bid (this page) 1. FOB Point Delivered Only 2. Terms of Payment (e.g. Net 30) 2z 10days; net 30 days 3. The City shall receive shipment or project completion notice within 45 days from the date Vendor receives Official Purchase Order or Notice to Proceed. Recheck your quotations prior to submission. Bids may not be changed after being opened Oflice of Purchasing and Materials Management I MAR -16-00 11:33 AM CAPE CANAVERAL PW 407 799 4980 P.67 ,rppsl Agreement for Sanitary Sewer Lining and Manhole .tehabilltation INVITATION TO DID 0 8199-13 INVITATION TO BID You are invited to Bid on the following: Annual Agreement for Sanitary Sewer Line Manhole Rehabilitation and Root Control Item Unit No. Quantity Unit Description Price T tal 45. EA RICIP point repair 5 feet long (1 standard leg or sleeve) for $2, 875.0 $ 10 in. size. 46. EA RICIP point repair 5 feet tong (1 standard leg or sleeve) for $3.475.0 $ 12 in. size. 47, EA RICIP point repair 5 feet long (1 standard leg or sleeve) for 56,785.0 $ 18 in. size. 48. EA RICIP. point repair 5 feet long (I standard leg or sleeve) $10,145. 0$ for 24 in. size, 49. FT Pricing for each additional foot of RICIP point repair in a 35.00 $ excess of 5 feet long (1 standard Ieg or sleeve) for 6 in. site. 50. FT Pricing for each additional foot of RICIP point repair in $ 120. b0 $ excess of 5 feet long (1 standard leg or sleeve) for 8 in. 51. FT. size. Pricing for each additional foot of RICIP point repair in S150.00 S excess of 5 feet long (1 standard leg or sleeve) for 10 in. size. Total Bid (this page) 1. FOB Point Deliver&d Qnly 2. Terms of Payment (e.g. Net 30) 2% 10 days; net 34 dw 3. The City shall receive shipment or project completion notice within 45 days from the date Vendor receives Official Purchase Order or Notice to Proceed. Recheck your quotations prior to submission. Bids may not be changed after being opened Office of Purthasint and Materials Management Page: 4 MAR -16-00 11:34 AM CAPE CANAVERAL PW anal Agreement for Sanitary Sewer Lining and Manhole .ettabilibtion 407 799 4950 P.0$ a.. l'.. ATIOM TO BID 0 8199-1310 INVITATION TO BID You are invited to Bid on the following: Annual Agreement for Sanitary Sewer Line, Manhole Rehabilitation and Root Control Item Unit Na. Quantity Unit Description Price Totalll 52. FT. Pricing for each additional foot of RICIP point repair in S180.0 S excess of 5 feet long (I standard leg or sleeve) for 12 in. size. 53. FT. Pricing for each additional foot of RICIP point repair in S270.0 5��+ excess of 5 feet long (1 standard leg or sleeve) for 18 in. size. 34. FT. Pricing for each additional foot of RICIP point repair in excess of 5 feet long (1 standard leg or sleeve) for 24 in. x360.00 S_ size. GROUP VI Robotic Protrusion Removal 55. EA Latemal Protrusion Removal by robotic cutter for G" pipe. SNo Bid $ Sb. EA Latemal Protrusion Removal by robotic cutter for 8" pipe. $800-00 a_ Total Bid (this page) 1. FOB Point Delivered QUIX 2. Terms of Payment (e.g. Net 30) 22 10 days; net 30 days 3. The City shall receive shipment or project completion notice within 45 days from the date Vendor receives Official Purchase Order or Notice to Proceed. Recheck your quotations prior to submission. Bids may not be changed after being opened of ice or Purchasing and Materials Management Pate: 15 �y CITY OF CAPE CANAVERAL PURCHASE ORDER PHONE: (407) 868-1230 FAX: (407) 799-3170 To: GRINER'S PIPELINE SERVICES, INC. Date: 10/12/1999 JNumber: 15654 21902 STATE ROAD 46 MT.DORA, FL 32757-9300 Ship Via: Delivery Date: Terms: Buyer: hip To: CITY OF CAPE CANAVERAL Bill To: CITY OF CAPE CANAVERAL 600 TOWER BLVD. ATTN: FINANCE DEPT. CAPE CANAVERAL, FL 32920 P.O. BOX 326 CAPE CANAVERAL, FL 32920 ,uantity Description Unit Price Amou it REHABILITATION OF CITY SEWER SYSTEM APPROVED BY 84,223.551 84, 23.55 COUNCIL -ON 3/16/99 Total 84, 23.55 Cost Distribution 401-0019-901.6310 84,223.55 fa�av l= Q a,✓f��� moo. rN✓.4L GGaz s9;-�►+°�✓ ��, 1 9 ON t 1b� oo RAJ ..%A'# 6b,2 3 S'0• 3 / OCT 4 FLORIDA TAX EXEMPTION NO. 15-02-048901-54C ONDITIONS - READ CAREFULLY The right is reserved to cancel this order if not filled within the contract time, if specified. The conditions of this order are not to be modified by any verbal understanding. Acceptance of this order includes Acceptance of all terms, prices, delivery instructions, specifications and conditions stated. INVOICES AND PACKAGES MUST BEAR THIS ORDER NUMBER. Please forward all invoices to Finance Department THE CITY ASSUMES NO RESPONSIBILITY FOR GOODS DELIVERED WITHOUT THE AUTHORITY OF APLPPERLY EXECUTED PURCHASE ORDER. This Purchase Order VOID as of 9/30/2000. '� O A PURCHASING AGENT WHITE -VENDOR GREEN -FINANCE BLUE -DEPARTMENT GOLD-RECENING Meeting Type: Regular Meeting Date: 03-21-00 AGENDA Heading Resolutions Planning Organization and submit copies of this resolution to the MPO and the Brevard Legislative delegati Item g The MPO is concerned that the state legislature with the approval of HB 893 divert an estimated $6 million No. I am supportive of this resolution. Exhibits Attached: AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: RESOLUTION 2000-07, OPPOSING THE DIVERSION OF TRANSPORTATION REVENUE PROPOSED IN HB 893 AND TRANSPORTATION PROGRAMS IN GENERAL DEPT./DIVISION: LEGISLATIVE Requested Action: City Council consider approval of Resolution No. 2000-07 as requested by the Brevard Metropolitan ( PO) Planning Organization and submit copies of this resolution to the MPO and the Brevard Legislative delegati n. Summary Explanation & Background: The MPO is concerned that the state legislature with the approval of HB 893 divert an estimated $6 million annually from state highway projects within Brevard County. I am supportive of this resolution. Exhibits Attached: Resolution No. 200-07 City Manager' ffice Department LEGISLATIVE I— -- I off I 11 1 111 11 1 1 a RESOLUTION NO. 2000-07 RESOLUTION OPPOSING DIVERSION OF TRANSPORTATION REVENUE PROPOSED IN HB 893 AND FROM TRANSPORTATION PROGRAMS IN GENERAL. WHEREAS, the Legislature is considering HB 893 that would direct one-half of the State Comprehensive Enhanced Transportation System (SCETS) motor fuel tax to the Florida Intrastate Highway System; and WHEREAS, the diversion of such revenue will have a long term deleterious affect on local governments by reducing the ability of the Florida Department of Transportation to fund critical improvements on non-FIHS roads; and WHEREAS, more than $300 million of transportation revenue is annually diverted to non -transportation programs including school construction and aquatic weed control; and WHEREAS, redirecting said revenue to transportation programs will increase funding for needed transportation improvements without raising motor fuel taxes; and WHEREAS, the current state budget surplus can be used to replace the funding for those programs heretofore funded by transportation revenue. NOW, THEREFORE BE IT RESOLVED by the City Council of Cape Canaveral, Brevard County, Florida that: SECTION 1. The City of Cape Canaveral City Council opposes the section of HB 893 that would redirect one-half of the State Comprehensive Enhanced Transportation System motor fuel tax to the Florida Intrastate Highway System. SECTION 2. The City of Cape Canaveral City Council encourages the Legislature to eliminate the diversion of transportation revenue to non -transportation programs. SECTION 3. The City of Cape Canaveral City Council supports the use of state budget surplus revenue to offset the diverted funding. City of Cape Canaveral, Florida Resolution No. 2000-07 Page 2 ADOPTED BY the City of Cape Canaveral, Florida this day of , 2000. Rocky Randels, MAYOR ATTEST: FOR AGAINST Burt Bruns Sandra O. Smith, CITY CLERK Buzz Petsos Rocky Randels Richard Treverton APPROVED AS TO FORM: Larry Weber Kohn Bennett, CITY ATTORNEY GACityC1k\Reso1utionsl0ppose Diverting Transportation Revenue.doc BREVARD METROPOLITAN a a a a a a a PLANNING ORGANIZATION 2725 Judge Fran Jamieson Way, Bldg. A Melbourne, Florida 32940 DATE: March 10, 2000 TO: Tom Jenkins, County Manager City Managers FROM: Bob Kamm, Brevard MPO SUBJECT: Pending Transportation Legislation Telephone: (407) 69 890 Fax (407) 690-6827 SunCom: 36668SO At their meeting on March 9, the Brevard MPO requested that the County and municipalities be notified of two legislative issues concerning the diversion of transportation revenue. The first is a provision in HB 893 that would divert more than $6 million annually from state highway projects in Brevard to the Florida Intrastate Highway System (FIHS). The FIHS is composed of the interstates and other significant state arterial roads. In Brevard, only 1-95 and SR 528 are on the FIHS. Currently, four cents of the state's gas tax is returned to the maximum extent feasible to the county in which it is collected. It can be used for maintenance and capacity projects on any state road in that county. The provision in HB 893 would, instead, direct one-half of the tax to any FIHS roadway in the state. Gas taxes once collected and spent in Brevard could fund improvements to 1-4, for example. The MPO believes this change will result in underfunding of the majority of state roads and have negative long-term impact on local governments. Attached is a letter summarizing the potentially significant concurrency issues that could arise if the redirection of funding to the FIHS is adopted. The second issue concerns diversion of funds from transportation to other uses. Each year about $300 million of revenue levied through various transportation taxes and fees is diverted to other uses and not spent on transportation. The diversion occurs because over the years various statutes have tapped transportation as a revenue source. More than $100 million, for example, is diverted to school construction. Aquatic weed control and tourism and trade programs are funded by transportation revenue. This year, the legislature will consider eliminating the $100 million of transportation revenue diverted to the state's General Fund. The Senate has already passed a bill to use the state budget surplus to replace the funds. While this is a necessary first step, the MPO believes the Legislature should pursue redirecting all transportation revenue back to transportation programs. Eliminating diversion will increase transportation revenue without raising fuel taxes. The MPO staff has prepared a sample resolution addressing both of these topics. We would appreciate your consideration of the resolution. If adopted, please submit a copy to the MPO and to the Brevard County Legislative Delegation. If you have further questions, please contact me at your convenience. 3REVARD METROPOLITAN PLANNING ORGANIZATION ?725 Judge Fran Jamieson Way, Bldg. A Vlelbourne, Florida 32940 March 9, 2000 0000ae�o Representative Kelly Smith, Chairman House Transportation Committee Room 418 House Office Building Tallahassee, Florida 32399-1300 Representative Jim Fuller, Chairman House Committee on Transportation and Economic Development Appropriations Room 221 Capitol Building Tallahassee, Florida 32399-1300 Telephone: (407) Fax: (407) SunCom: Subject: HB 893 -- Modification to State Comprehensive Enhanced Transportation System Tax Dear Representatives Smith and Fuller: The Brevard Metropolitan Planning Organization would like to advise you of its opposition to the proposal in House Bill 893 to modify the distribution of revenue generated by the State Comprehensive Enhanced Transportation System (SCETS) motor fuel tax. The Brevard MPO believes this proposal will have a deleterious affect on the Florida Department of Transportation's ability to fund needed improvements to the two-thirds of the state highway system that is not on the Florida Intrastate Highway System. The pertinent section of HB 893 is found in Section 2 of the bill as filed. Statute now requires SCETS tax funds to be used only in the FDOT district in which the tax is collected and, to the maximum extent feasible, to be programmed for projects in the county in which the funds are originally collected (206.608 FS). Furthermore, the SCETS tax levied in each county is determined by the amount of local gas tax imposed in that county. The current law, therefore, clearly establishes a linkage between the SCETS tax and local conditions. The linkage to local conditions was critical to its passage in 1990. The linkage to local conditions is undermined in HB 893. HB 893 proposes to direct one-half of SCETS revenue to the Florida. Intrastate Highway System. The bill language does not specify that the diverted SCETS revenue should be programmed on FIHS projects in the district or county in which the funds originated. Therefore, SCETS revenue collected in one county could be programmed anywhere in the state. Even though there are important FIHS needs in Brevard County, for example, HB 893 does not provide any assurance that those needs will be addressed with SCETS revenue generated in Brevard County. The proposed diversion of funds from local to state-wide projects is an alteration of the fundamental premise on which the SCETS tax is based. The MPO is concerned that diverting one-half of the SCETS revenue to the FIHS will result in insufficient funds for needed improvements on non -FINS roads. SCETS revenue is very flexible. It is used to match federal aid, to fund multimodal programs and to finance critical maintenance, operational and capacity improvements on any state highway system roadway. Approximately $13.5 million of SCETS revenue is annually programmed for state highway projects in Brevard County. About $4 million of SCETS proceeds are annually programmed for federal match, resurfacing, transit, airport, port and traffic operation projects. The passage of HB 893 would leave about $3 million of SCETS revenue each year for state highway capacity projects in Brevard County. Transportation Planning for Florida's Space Coast 9 Representative Smith Representative Fuller March 1, 2000 Page Two FDOT is presently under a directive to program at least fifty percent of all capacity funds on FIHS projects. Further diminution of SCETS funds proposed in HB 893 will result in funding levels that are inadequate to address current and projected deficiencies on the non-FIHS portion of the state highway system. The consequences for local governments could be severe because local governments must abide by the 1985 Growth Management Act. As needed capacity projects are deferred, concurrency deficiencies on the state highway system can occur. The steps required to deal with such deficiencies can have a significant negative impact on a local community. In summary, the Brevard MPO urges you to not support the provision of HB 893 that would redirect one half to the SCETS tax to the FIHS because such a measure is contrary to the original legislative intent of the SCETS tax, will lead to insufficient funding for the two-thirds of the state highway system, will create a hardship for local governments and does not promote a balanced approach to the state's transportation problems. Thank you for your consideration. c: Brevard Legislative Delegation Secretary Tom Barry Howard Glassman M PO/TAC/CAC RESOLUTION Number RESOLUTION opposing diversion of transportation revenue proposed in HB 893 and from transportation programs in general. WHEREAS, the Legislature is considering HB 893 that would direct one-half of the State Comprehensive Enhanced Transportation System (SCETS) motor fuel tax to the Florida Intrastate Highway System; and WHEREAS, the diversion of such revenue will have a long term deleterious affect on local governments by reducing the ability of the Florida Department of Transportation to fund critical improvements on non-FIHS roads; and WHEREAS, more than $300 million of transportation revenue is annually diverted to non -transportation programs including school construction and aquatic weed control; and WHEREAS, redirecting said revenue to transportation programs will increase funding for needed transportation improvements without raising motor fuel taxes; and WHEREAS, the current state budget surplus can be used to replace the funding for those programs heretofore funded by transportation revenue. NOW, THEREFORE BE IT RESOLVED by the [City/Town/County] that: 1. The [City/Town/County] opposes the section of HB 893 that would redirect one-half of the State Comprehensive Enhanced Transportation System motor fuel tax to the Florida Intrastate Highway System. 2. The [City/Town/County] encourages the Legislature to eliminate the diversion of transportation revenue to non -transportation programs. 3. The [City/Town/County] supports the use of state budget surplus revenue to offset the diverted funding. DONE, ORDERED AND ADOPTED THIS DAY OF , 2000. [CITY/TOWN/COUNTY] MAYOR ATTEST: CLERK Meeting Type: Regular Meeting Date: 03-16-00 AGENDA Heading Discussion contractor. Item 9 No. Exhibits Attached: AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: DISCUSSION: REUSE PROJECT UPDATE DEPT./DIVISION: WATER RECLAMATION/PUBLIC WORKS Requested Action: City Council will be presented an update on the status of the reuse project by the public works director and the contractor. Summary Explanation & Background: See attached memo and schedule. Exhibits Attached: Public works director's memo of 03-10-00 City Mina Mce Department WATER RECLAMATION/PUBLIC WORKS :/a /meetin 2000/03- use.doc MEMORANDUM TO: Bennett C. Boucher City Manager FROM: Ed Gardulski Public Works Director DATE: March 10, 2000 RE: City Council Item for March 21, 2000 Discussion item: Reuse Construction Update The following is the construction status of Phase III, Part 1 Location Pipe Installed Tie-in PSI Test Services Ridgewood YES YES YES YES Madison Ave YES YES YES YES Tyler Ave YES YES NO NO Fillmore Ave YES YES NO YES Pierce Ave YES YES NO YES Lincoln YES YES NO NO The following is the construction status of Phase 11I, Part 2 Adams Ave NO NO NO NO Jefferson Ave NO NO NO NO Harrison NO NO NO NO Ridgewood Ave YES NO NO NO The construction progress has been slow over the past four weeks. The main lines have been installed for part 1. The Contractor has completed Tie-in. Service installations and pressure test lines are in progress. After the testing project restoration will commence, i.e. sidewalk repairs and sod. Restoration needs to be performed after the pressure testing, just in case repairs are required. The project is about 90% complete and should be completed in two weeks. Over all Phase III extension has been running about 30 days behind schedule. Processed the second pay requests. SSA has completed the Construction design for Phase III Extension Part 2. Contractor has received these drawings for review. Scheduled City Council approved the Change Order No. I for February 15`x'. This change Order includes the following streets: Jefferson Ave. from Poinsetta to the beach end, Adams Ave from Poinsetta to beach -end, Harrison Ave. from Magnola Ave to Ridgewood, Ridgewood north 500 feet and Banana River Drive south 700 feet. SSA has been tasked to design Phase IV of the reclaimed water project. The City has made application for an Alternative Water Supply Grant for this project and has been selected to receive $72,180. Scheduled to start construction June -July time period. Attached is a copy of the contractor's construction schedule. A representative from Carl Hankin's Inc. will be present to answer any questions. Z F U W J h [a � y LU U w U Q = z _W F- f W h- t0 O W C7 � ww W U C W Q? W f" W H Q J C' 2 U U w N Q h Z W F- F W H V 2 y p U U U w N Q (~A = Z W F H W H a~1 d' .W.1 (n U w U Q N z W H W F 1- o J U) w !/) Q N = z W F r W H y W It U) U w N Q w Z F W W F H q O W O W LU U w co Q CO Z W H K i Uo W o N V Yf tl I O N m N N N o u ao o a = Caad s F- N m W U D LL 4 D � 9 9 S ' o T O Z> In -1 p pa M z p Z J W � J F? z z fd w H r- W F- O i a U N W 2 Z V W O N C NY 8 Q g x3 J a LL UT Y- U o m ro .... .. .. ... ...... ..... ......... `m' a`o r a a E g a m s in K c � cp N N x - Q oa a N � . N i I p Q �a I SII s F- N W U oF- S W = F x F pa M z p Z J W � J F? z z fd w H r- W F- O i a U N W 2 qa > a a C (¢j � yr a`o Meeting Type: Regular Meeting Date: 03-21-00 AGENDA Heading Discussion facility. Item to No. up - flow automatic backwash filters with down -flow automatic backwash units. AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: REPORT ON WATER RECLAMATION SAND FILTERS DEPT./DIVISION: WATER RECLAMATION/PUBLIC WORKS Requested Action: City Council will be presented a report prepared by SSA on the sand filter problem for the water reclamation facility. Summary Explanation & Background: See Public works director's memo of 03-15-00. It is recommended by the consultant to replace the existin� up - flow automatic backwash filters with down -flow automatic backwash units. Exhibits Attached: Public works director's memo of 03-15-00 City Man s ffice % Department WATER RECLAMATION/PUBLI //�---- / iii WORKS MEMORANDUM TO: Bennett C. Boucher City Manager FROM: Ed Gardulski Public Works Director DATE: March 15, 2000 SUBJECT: City Council Agenda Item for March 21, 2000 Discussion Item: Treatment Facility's Parkson Sand Filters Failure The Water Reclamation Treatment Facility has been experiencing a deterioration of the Dynasand filter media silica sand. The three filters are located at the end of the treatment process. The function of these filters is to polish the effluent for the production of the City's Reclaimed Water. On March 15, 1999, the three (3) filters were taken out of service for inspection. The Design Engineer from Hartman and Associates, the filter manufacturer Pakson Inc., and the Public Works Director conducted an on-site inspection of filter system. In addition, the City's engineering firm, SSA, recorded the elevations of the structure and its hydraulics components. Attached is an evaluation of the Dynasand Filter from Hartman and Associates. It is recommended that the filters sand media to be replaced to the original manufacturer's specification and the system to be placed in operation for further observations. This task was completed April 1999. During January 2000, SSA was tasked to evaluate the City's Wastewater Treatment Facility's sand filter and provide a report to the City of Cape Canaveral. Attached is a copy of SSA's findings. A representative from SSA will be present for this discussion item. Attachment CC: File January 14, 2000 Mr. Ed Gardulski Public Works Director City of Cape Canaveral 105 Polk Avenue Cape Canaveral, FL 32920-0326 SSA RE: SSA Fee Proposal for Evaluation of the City's Wastewater Treatment Plants' Sand Filter Dear Ed: Per your request, SSA is pleased to present our engineering fee proposal for evaluation of your WWTP's sand filter. Based on our earlier discussions, this task will involve two (2) basic steps. These include: SSA SCOPE OF SERVICES Task 1 - SSA will first furnish to the City a list of key documents (and plans) needed for the evaluation. This list will include elevation surveys of the filter system, photographs, previous study summaries, etc. The City will bring this information to SSA. Task 2 - Upon receipt of the data, SSA will evaluate the system and also include telephone conversations with historic parties. An engineering memorandum will be prepared documenting our findings. Following the City's review of our memorandum, a telephone conference call will be made between SSA and City staff to clarify any questions. (This work will be performed by Dr. Kazmierczak, PE, in SSA's Maryland Office.) If additional work such as court testimony, etc., is required, this will be performed by SSA under a separate proposal. SCHEDULES AND FEES Schedules: Upon receipt of written authorization to proceed SSA will begin work immediately by furnishing to the City a list of necessary documents. Following SSA's receipt of information, approximately two (2) weeks will be needed to complete the engineering memorandum. Fees: SSA's fee for this work will be on an hourly rate basis with reimbursable expenses not to exceed $4,600.00 without written City authorization. (Budget of approximately 50 manhours). SSA's fees will be invoiced once per month based on hours work plus reimbursable expenses and payment will be due within thirty (30) days of receipt. Compensation rates are based on ordinances, regulations and procedures in force on the execution date of this Agreement by the appropriate governing bodies having jurisdiction over the project. Any significant modification in these ordinance, regulations, procedures, etc. shall be justification for re -negotiation for the compensation due to the Consultant for the work involved. STO=R STAGG & ASSOCIATES ARCHITECT'S • ENGINEERS • PLANNERS, INC. 8680 North Atlantic Avenue P. 0. Box 1630 Cape Canaveral, Florida 32920 Tel 407-783-1320 Fax 407-783-7065 11c. #AAC000329 #EB0000762 #LB0006700 d:%civikprojectslproposaWgardulski eval wastewater.doc . cd Gardulski January 14, 2000 Paae 2 SSA Fee Proposal - Wastewater Treatment Plant Sand Filter Evaluation It is understood that any and all professional liabilities incurred by SSA throughout the course of rendering professional services on this project shall be limited to a maximum of the net fee received by SSA, not including reimbursable expenses and sub -consultants, for all services rendered on the project. Should it become necessary to obtain a third party to collect our fees for services, the City hereby agrees to pay all costs of such collections including Attorney's fees. The City and SSA respectively bind themselves, their partners, successors, assigns and legal representative to the other party to this Agreement and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants to this Agreement. Neither the City nor SSA shall assign, sublet or transfer any interest in this Agreement without the written consent of the other. The terms and conditions of this proposal are effective through March 1, 1999. Acceptance after this date may necessitate increased fees or altered conditions. Ed, your authorization of this proposal can be accomplished by the appropriate City signature below and our receipt of a signed copy. SSA is looking forward to working with the City on this project in Cape Canaveral. Sincerely, Stottler Stagg & Associates Architects, Engineers, Planners, Inc. John A. Pekar, PE Vice President JAP JIs didviRprojeds%proposaWgardulski eval wastewaler.doc ACCEPTANCE: TITLE: DATE: 11AR-15-'v.0 13:19 ID:STOTTLER STaRMER March 15, 2000 City of Cape Canaveral 105 Polk Avenue Cape Canaveral, Florida 32920-0326 Attention: Edward Gardulski Public Works Director TEL NO:3E17310751. 9511 P02 Subject: Evaluation of City's Wastewater Treatment Plant's Sand Filters Reference: 1. Purchase order Number 87 2. Stottler Stagg & Associates Inc. Letter Proposal dated February 14, 2000 Stottler Stagg & Associates Inc. (SSA) has completed its review of the below listed key documents provided by the City of Cape Canaveral pursuant TASK 1 of the above referenced letter proposal. 1. STP Shop Drawings prepared by Wharton -Smith Inc. 2. Submittal No. 064A, Conformed Filter Drawings prepared by SUCA/Farkson and reviewed and Approved by Hartman Associates Inc. 3. Installation Instructions for DYNASAND FILTER prepared by Parkson Corporation. 4. Pages 4-49 to 4-55 of the STV O&H Manual prepared by Hartman Associates Inc. 5. Trip Report dated 9/1/99 prepared by Mr. Miguel Gutierrez of the Parkson Corporation. 6. Graph showing Total Susponded Solids Concentrations in Clarifier, Sand Filter and Plant effluents from 9/1 through 10/31. 7. Graph showing Total NT0 (Turbidity) in Clarifier, Sand Filter and Plant effluents from 9/1 through 10/31. 8. Color Photograph showing sand deposits in sand filter plenum. 9. Copy of survey notes prepared by SSA listing elevations of invert of clarifier effluent pipe and sand filter overflow weirs. Based on our review of the above listed materials and discussions with plant operators problems being experienced with the existing up -flow sand filters are as follows: 1. A relatively large loss of sand to the filter plenum during normal plant operations. STO=R STAGG & ASSQMIM ARCHITECTS ■ ENGINEERS • PLANNERS, INC. OW North Adeadc Avenue P. 0. Hex 100 Cape Canaveral, aloft 320M Tel 407 793 1320 Fact 407 7837065 . ....._ 'IAR-15-'00 13:20 ID:STOTTLER STARhIER TEL NO:3017310751 4511 P03 2. Periods of time when filter effluent SS concentrations and NTUts are substantially higher filter influent SS concentrations and NTU. 3. Erosion of the filter's riser tubes. On the basis of discussions with plant operating staff we understand that the loss of sand from the filter beds to the plenum has been occurring over the past 3 years and that replacing the lost sand has cost the City between $ 15,000 and 25,000 per year. Based on the information provided by the City, the most likely cause of the sand loss into the filter plenum is backflow through the riser tubes, althougn losses through the riser tubes could occur if the distribution (inlet) hood was mis-aligned during installation or was not installed with the proper overlap. The piping arrangement at the STP does not conform to that shown in Drawing $F-1228 presented in the "Installation Instructions for DYNASAND FILTER" prepared by Parkson Corporation in that the STP's filter bypass pipeline is located below the filter weir level. Also, the filter's influent manifold piping is below the filter weir level. Both of these arrangements are undesirable, in that backflow Can occur if 1. The by-pass valve is opened while any filter isolation valva is open, or 2. If the isolation valve to an out of service (empty) filter is opened while other filters are in operation. Also, back flow can occur if proper cage is not exercised in draining the filters for inspection and servicing. The planus operations staff are knowledgeable and well trained, and thus are fully aware of the limitations inherent in the by- pass and influent manifold piping arrangements. Additionally, the Operations Section of the Parkson Corporation's "Installation Instructions for DYNASAND FILTER" provides the necessary instructions concerning how to drain, by-pass, and restore the Parkson units to service, safely i.e. without causing backflow in the risers. Thus in our opinion improper operational procedures are not the source of the sand loss problem. The filters were inspected by a Parkson Corporation REP (Mr. Miguel Gutierrez) during a trouble shooting visit to the plant. Per his trip report dated 9/1/99 the filters were "'sound" in that: a. The overlap of feed distribution hood over the riser tubes was proper. b. The fiberglass joints were in tact and the contact between the fiberglass pieces themselves and the fiberglass pieces and the filter wall was adequate. c. No gaps between the bottom cone and the wall were visible from the plenum. F, IAR-15-100 173:21 ID:STOTTLER STARNER TEL NO:�!0173107`1 x511 PO4 Thus, based on the Parkson trip report it would appear that mis- alignment of the distribution hood is not the source of the sand loss problem nor is loss of sand through gaps in the filterts bottom cone. In June of 1999 a series of hydraulic tests, which were set up to induce backflow of sand in the filters, were conducted under the supervision of a Farkson corporation "REP", Mr. Miguel Gutierrez. The tests which were run included: 1. Submerging the clarifier effluent pipelines by restricting flow to the filters to determine whether or not air was escaping from the pipe at that point, and if so to gauge the severity of the air release. 2. Stopping flow to the filters (by-passing the filters), with the intent of gauging any sudden drop in the filter water levels. 3. Increasing flow to the filters from zero to full plant flow (2-6 mgd) to gauge the severity of air entrainment and its consequences if any. 4. Draining of one filter. Per the Parkson trip report with the possible exception of Test No. 1 above none of the tests affected filter operation. Test No 1 did reveal some air aursting from one of the clarifiers. The Parkson report concludes that there was clear evidence that air -entrapment in the clarifier effluent pipe could be contributing to the sand backflow. It was postulated that with a sudden increase in flow the clarifier effluent line would become submerged trapping some air. Then the air entrained in the effluent pipe backflows out through the inlet inducing a momentary back -surge which pulls a small amount of sand back through the riser into the filter plenum. Recommendations presented in the Parkson Report include the following: 1. Eliminate trapped air in clarifier effluent pipe by either damming the inlet 'Crough or installing a vent in the effluent pipeline, or 2. Eliminating the plenum by installing a top feed design 3. Continued monitoring, The configuration/elevation of the clarifier effluent pipeline is such that it is possible for "gulps" of air to be entrained in this pipe during extreme fluctuations in plant flow. The presence of such air -gulps in this pipeline may result sand backflow. Flooding (filling) the clarifier effluent pipe by pinching down the filter isolation valves could eliminate the problem of air entrapment. However, there may not be sufficient head available between the Clarifiers and the filters to utilize this approach without submerging the clarifier weirs, particularly during times of peak flow. Given the hydraulic condition at the existing plant and the continued high cost of replacing lost sand it is our C MPR -15-100 13:21 ID:STOTTLER STRRMER recommendation that the city automatic backwash filters with backwash units. TEL NO:3017310751 11511 P05 replace the existing up -flow down -Plow (top feed) automatic if you have any questions or tcnanents concerning this report please contact the undersigned at (301) 864-0096. Sincerely, E _ Ka rczak, Senior viae President Stottler Stagg & Associates. 4 HIAPRT�NIAN ASSOC 11IMM II'.\I N - i.11ll.-. 1. (.11f1,1,1,,11��r.1'r:, engineers, hydrogeologists, sur-,reyors & to %I...k I I.Ilka'. 1'" \I. 11.ln dll h: <ihmlJ(, Ir. PI(. \\ Illi.uu U 11uw�r. I'P 1I'.\d III .UIUc 1.\Il %I C March 22, 1999 Mr. Walter Bandish City of Cape Canaveral 105 Polk Avenue Cape Canaveral, FL 32920 Subject: Evaluation of Dynasand Filters Dear Mr. Bandish: Per your request Hartman & Associates, Inc. (HAI) has evaluated the problem you have experienced with the loss of sand in the Dynasand filters and discussed this issue with the filter manufacturer. Due to the hydraulic conditions at the filter influent and bypass piping, HAI has determined that the loss of sand in the filters could possibly have occurred during times when the bypass valve has been opened without closing the filter isolation valves prior to opening the bypass valve. At any time if the bypass valve is open and all of the filter isolation valves are not frilly closed, approximately six feet of pressure head exists forcing flow back through the filters And the bypass piping. HAI recommends that the bypass valve be protected from accidental opening by a lock or other means to ensure that this problem does not occur in the future. If the filters are required to be bypassed, the correct procedure is as follows: 1) Fully close all three filter isolation valves. 2) Open the filter bypass valve. 3) To bring filters back online, fully close the filter bypass valve. 4) Open three filter isolation valves. 5) Lock filter bypass valve in fully closed position. Based on the above, we will modify the operation and maintenance manual to reflect this procedure. 201 EAST PINE STREET SUITE 1000 • ORLANDO, FL 32801 TELEPHONE (407) 839-3955 • FAX (407) 839-3790 • Nvwwxonsulthaixom ORLANDO FORTMYERS PL- NTATION IACKSONVILLE lun ) Fo.c. I'F IM11-, If .\nJr('w T W",, I Jock. 11.1i. 111 'rl•IR I:. Il'll 111\, I's -m. Joseph S. Ih rmili. Illi. Uary•1 < wa HAI #92-288.00 Per your request Hartman & Associates, Inc. (HAI) has evaluated the problem you have experienced with the loss of sand in the Dynasand filters and discussed this issue with the filter manufacturer. Due to the hydraulic conditions at the filter influent and bypass piping, HAI has determined that the loss of sand in the filters could possibly have occurred during times when the bypass valve has been opened without closing the filter isolation valves prior to opening the bypass valve. At any time if the bypass valve is open and all of the filter isolation valves are not frilly closed, approximately six feet of pressure head exists forcing flow back through the filters And the bypass piping. HAI recommends that the bypass valve be protected from accidental opening by a lock or other means to ensure that this problem does not occur in the future. If the filters are required to be bypassed, the correct procedure is as follows: 1) Fully close all three filter isolation valves. 2) Open the filter bypass valve. 3) To bring filters back online, fully close the filter bypass valve. 4) Open three filter isolation valves. 5) Lock filter bypass valve in fully closed position. Based on the above, we will modify the operation and maintenance manual to reflect this procedure. 201 EAST PINE STREET SUITE 1000 • ORLANDO, FL 32801 TELEPHONE (407) 839-3955 • FAX (407) 839-3790 • Nvwwxonsulthaixom ORLANDO FORTMYERS PL- NTATION IACKSONVILLE Mr. Walter Bandish March 22, 1999 Page 2 Moreover, as we discussed this morning on the phone, I suggest that you monitor the sand levels using the method discussed. Please be aware that some loss of sand in these type of filters is inherent in the filter design, and sand level does periodically have to be monitored. However, the amount of sand lost in your Dynasand filters may have occurred due to opening of the bypass valve without following the procedure noted above. If you have any questions, please do not hesitate to call either Mike or me. Very truly yours, Hartman & Associates, Inc. Harold E. Schmidt, Jr., P.E. Vice President HES/ska/92-288.00/corresp/bandish.mjh cc: Ed Gardulski, Director or Public Works Michael J. Hudkins, P.E. HAI Post -It" brand fax transmittal momo'671 Norp.aa. ► 7L : � From C o Co. Ph FOY Depl. Fir N t'ARKSON CORPORATION DYNASANDo FILTtR PARKSON 0.9 mm FILTER MEDIA SPECIFICATIONS 1. Grain Shape, Effective Size (ES), and Uniformity Coefficient (UC) 7W"4T -k oreW InAre, The sand must conform to the conditions of A or B ahol,e. The filter media shall predominantly be siliceous material that will resist degradation during handling and use. Crashed gravel is not acceptable. "Sub -Round" grains are essentially round with smooth surfaces (n.on-angular). "Sub -Angular" grains are essentially sub- angular with multifaceted smooth edges. The effcctivc size is the diameter of the tenth percentile grain (DI O). The uniformiy, coefficient is the diameter of the sixtieth percentile grain divided by the diameter of the tenth perecntilc grain (DWD10). The effective size and uniformity coefficient are determined by a dry, l.0 -minute automatic sieve shaker procedure on a 500-800 gram sample with U.S. Sieve Nos. 12, 14, 16, 18, 20, 30, as well as a pan. 2. Fines Content - ' Fines" are defined by Park -son .for this size filter media as particles Passing through a 20 miesh screen. Fines should not exceed 1.5° o by wcight. 3. Specific Gravity - dry specific gravity must be greater than 2.5 4. Hardness - minimum 6.0 on Moh's scale (ref. Testing and Inspection of Engineering Materials, McGraw-Hill Cook Co., New York, NY; 3rd Edition; page 209) S. Acid Solubility - less than I% total loss in mass after a 30 -minute immersion in an approx. 20% by «rt. hydrochloric acid (HCl) solution (made by combining equal volumes of water and standard reagent grade 12.1 N (approx.) HCl) 6. General - must be in accordance with AWWA Standard B-100-89. sand09a.doc BHB 6/17/97 Ii An Axel jornsw htc. Company '2—,.77 NW 62 Street P.O. Box 4QS399 Fort Louderdale FL 33340-8399 954 974-6610 FAX: 954 974-0182 D51 S T A N 1) A R 1) S A N 1) & S I L I (.: A C 0 P. Q) BU X I c ; 1) VACSIMILL SHEET A C9l1V N NY I)A P? C *a I,! It IN'l- NL'M III K NI 'V11.1.11, KV JL -'5 ID E(D[EuvE MAR 191999 1 9 n4 I 1': :IOU P; A X 'Y 4 1 .4 1 1 ' 1 4'1 MEMORANDUM DATE: MARCH 16, 2000 TO: HONORABLE MAYOR AND MEMBERS OF CITY COUNCIL FROM: BENNETT C. BOUCHE CITY MANAGER SUBJECT: CITY MANAGER'S REPORT The city treasurer and I met with the staff of the Canaveral Port Authority, City Cocoa and the City of Cocoa Beach on issues involved with the turnover of sewer service from Cape Canaveral to Cocoa Beach for the port area. It was agreed that the Cape Canaveral and Port Franchise Agreement should be amended to extend the termination date to 05-01-2000 to coincide with the City of Cocoa's billing period. The City of Cocoa Beach and the port will amend their agreement to adopt Cocoa Beach's sewer rates. One issue that needs resolution, is it possible to transfer the existing sewer deposits on port customers to Cocoa Beach. Staff will investigate the number of outstanding deposits and seek a legal opinion on this issue. The City of Cocoa staff indicated that Burton & Associates now has the latest (12) month utility billing data, so we are back on track with the sewer rate and impact fee study. With the help of Mrs. Myers of Brevard County MPO, the school board has agreed to start busing the elementary school children from the Columbia Drive area. This service will start on Monday, March 20`''. The Beautification Board is working on a "Keep the City Clean" partnership program for residents and businesses. Staff will be working with the board on some recommendations to present to City Council. There is a zoning issue that has come up with three parcels along the Banana River just south of the Cape Shores subdivision. The current zoning map designates these parcels as R-1; however, one property owner claims it should be R-3 and is requesting the city to correct the issue. Staff has conducted research and has determined that this map change occurred in the early to mid 1980's. There is no specific ordinance listing these three parcels being changed from R-3 to R-1 has been located. Todd Peetz, City Planner, has indicated that if the city were to change the zoning, it would require a large-scale comprehensive plan amendment that would take approximately (6) months and require a DCA review and approval. I will also bring this issue up to the Planning & Zoning Board for discussion.